Prompt library

341 prompts · last added

201 results for “risk-register” · page 5 of 9

  • Make a Paragraph Sound Human: Rewrite Without AI Phrases

    Rewrites any paragraph so it sounds like a real person wrote it, keeping every fact and cutting stock AI phrasing.

  • Claude Code Hook Writer: Auto-Run Lint, Typecheck or Tests After Edits

    Produces a PostToolUse hook entry for settings.json, the script it calls and a concrete procedure to test that the check runs after file edits.

  • Outcome-First Codex Task Writer for a Feature or Bug Request

    Turns a raw feature or bug request into a paste-ready Codex task with a goal, constraints, files in scope, definition of done and exact verification commands.

  • Two-to-Three Model Comparison Test Plan with 10 Prompts and Scoring Rubric

    Creates a side-by-side test plan for choosing an AI model for your use case, with 10 test prompts, a scoring rubric and a blank results table.

  • Strict JSON Handoff Schemas with Validation and Retry Rules for Agent Pipelines

    Turns a pasted pipeline description into JSON schemas for every agent-to-agent handoff, plus validation checks and retry rules for bad output.

  • Repurpose One Article into 10 Native Posts Across Four Channels

    Turns one blog post or article into 10 channel-native pieces for LinkedIn, X, Instagram carousel, and newsletter.

  • Eight-Objection Handling Playbook: Acknowledge, Ask, Reframe, Evidence

    Builds a playbook that answers the eight most likely objections for your product and buyer, each in four steps with honest evidence.

  • Decaying Content Refresh Plan: Outdated Facts, Gaps and a New Intro

    Audits an old article for outdated facts and missing subtopics, proposes new sections and rewrites the intro for your target keyword.

  • LinkedIn Post from a Work Lesson, No Engagement Bait

    Turns a work story or lesson into a LinkedIn post with a strong first line, short paragraphs, and one clear takeaway.

  • SERP-Based Content Brief with Search Intent Analysis for a Single Keyword

    Create a writer-ready content brief from SERP observations you supply. It covers intent, required sections, evidence gaps, and a go or no-go call on whether the page is worth producing.

  • Habit Plan That Survives Bad Days and Missed Streaks

    Designs a habit around a tiny minimum version, a clear trigger and a restart rule, so one missed day does not end the whole attempt.

  • Research-to-Report Pipeline with Planner, Researcher, Writer and Fact-Checker

    Designs a four-agent pipeline for your report type with each agent's prompt, inputs, outputs and handoff format.

  • Spreadsheet and CSV Cleanup Report Skill (SKILL.md)

    A SKILL.md that has your agent profile a messy CSV or spreadsheet, fix it in a copy with a script, and report every change so the cleaned data can be trusted.

  • Post-Meeting Follow-Up Email and Stalled Deal Re-Engagement Sequence

    Creates a same-day recap email and a three-touch re-engagement sequence from meeting notes. It helps a rep confirm commitments and decide whether a quiet deal should be chased, reframed, or closed out.

  • Proposal Executive Summary and Mutual Action Plan Builder

    Converts discovery notes into a one-page proposal executive summary and a dated mutual action plan. It helps a rep decide whether the deal is ready to propose and what is still missing.

  • Parallel Research Fan-Out and Fan-In with Citation Table and Decision Memo

    Splits a research question across parallel research agents, defines source discovery and evidence review steps, merges findings into a citation table, and produces a decision memo without claiming live browsing.

  • Storyboard to AI Video Shot Prompts with Consistency Anchors

    Converts a scene idea into a numbered storyboard and per-shot prompts for AI video generators, with consistency anchors to reduce character and style drift between clips.

  • Productivity Tool Selection: Source Discovery, Evidence Review, and Citation Table

    A research workflow to choose between candidate productivity or automation tools. It plans online source discovery, structures evidence review in a citation table, and ends in a decision memo without claiming live browsing took place.

  • Weekly Capacity Plan with Commit, Defer, Delegate, Drop Table

    Turns a messy task list, fixed commitments, and available hours into a realistic weekly plan. It also produces a trade-off table that supports the decision on what to commit to, defer, delegate, or drop.

  • Customer Voice Synthesis from Reviews and Forum Threads

    Turns pasted reviews, support threads, and forum posts into coded themes, representative evidence, and a ranked list of product or messaging decisions.

  • Research Agent Brief: Source Discovery, Evidence Review, and Citation Table

    Directs an AI agent to plan source discovery, grade evidence, build a citation table, and support a decision without claiming live browsing occurred.

  • Tool Permission Matrix and Function Spec for a Tool-Using Agent

    Produces a least-privilege tool inventory, function definitions, and approval rules for an agent that calls APIs or internal systems.

  • Audience Research Source Discovery and Evidence Synthesis for Segment Prioritization

    Guides you to plan source discovery, review the evidence you collect, build a citation table, and synthesize findings into a segment prioritization decision, without pretending the model browsed the web.

  • Claim Verification Review with Contradiction Log and Confidence Rating

    Tests a specific claim or statistic against primary and peer-reviewed sources. Produces an evidence grid, a contradiction log, and a calibrated confidence rating with explicit unknowns.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

341 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Claude Code (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.