Parallel Git Worktree Task Split with Interface Contracts and Merge Order
Turns a pasted feature spec into independent coding-agent tasks with file ownership, interface contracts, a merge order and a done command for each task.
341 prompts · last added
195 results for “risk-register” · page 2 of 9
Turns a pasted feature spec into independent coding-agent tasks with file ownership, interface contracts, a merge order and a done command for each task.
Explains each clause of a pasted contract or lease in plain English, flags one-sided terms and lists questions to ask before signing.
Stress-tests a plan with five strong objections, hidden assumptions, the likeliest failure path and the evidence that would change the verdict.
Has Codex review a pull request and return comments sorted into blocking, should-fix and nit, each with the file and line, the risk, and a suggested change.
Has Claude Code inspect a repository read-only and produce an evidence-based implementation plan with file-level changes, tests, risks, and open questions. Use it to decide whether to start, split, or clarify a feature before any code is written.
Guides Cursor Agent through reproducing a bug, isolating the root cause with evidence, applying a minimal diff, and adding a regression test, ending with a verification checklist and risks.
Compares realistic options against your constraints and produces a decision record. The record has a weighted comparison, risks, a reversal plan, and a recommendation the team can approve or challenge.
Turns current pricing, cost, and customer data into a decision memo comparing hold, adjust, and repackage options, with scenario math, risks, and a controlled pricing test plan.
Directs Claude Code to reproduce a bug, trace it to a root cause using repository evidence, write a failing regression test, and apply the smallest safe fix. Ends with a verified diff, risks, and next actions.
Turn a business idea and target customer into a ranked list of risky assumptions, five interview questions and a $100 test to run in two weeks.
Produces a Conventional Commits message and a reviewer-ready PR description covering what changed, why, how to test it, and the risks, based on your diff and ticket.
Turns the changes in a branch into a clear pull request description: what changed and why, how to test it, risks and screenshots to add, in your repo's template if it has one.
Builds a negotiation script for a job offer: your anchor number with a reason, word-for-word replies to common pushback, and a walk-away line, using market data you supply.
Guides Claude Code to refactor a module safely by first pinning current behavior with characterization tests, then making small, reversible commits. Helps you decide whether the refactor preserved behavior and is worth merging.
Turns your source material into a diagnostic quiz with an answer key, a misconception map, and a reteach plan. It helps you decide who needs review and what to reteach.
Converts raw meeting notes or a transcript into a decision log, an action tracker with owners and dates, and a list of open questions. It separates what was stated from what was inferred, so follow-up is unambiguous.
Produces a 60-180 second explainer video script from a brief, with a scene-by-scene table for voiceover and visuals, a fact-check list, and a go/no-go checklist for recording.
Convert a call transcript or notes into a concise follow-up email, structured CRM notes, and a risk check on the deal. Helps the rep decide the next step and what to say.
Plan a custom GPT before building it. Produces the instruction text, knowledge file plan, conversation starters, and a test set so you can decide whether to build, narrow, or skip it.
Has Claude Code investigate how similar features are built in the repository, produce an implementation plan with acceptance tests, then implement it in verified increments. Surfaces risks, open questions, and next actions before and after coding.
Designs Good-Better-Best pricing for your service or SaaS: what goes in each tier, price points with reasoning, the tier you want most people to pick, and what to test first.
Turns a vague GitHub issue into a self-contained task with context, testable acceptance criteria, files to touch, and tests to add, so the Copilot coding agent can finish it.
Turn your job offer and target number into a polite counteroffer email, phone talking points and replies to the three likeliest pushbacks.
Turns a pasted CLAUDE.md or AGENTS.md into a shorter file of verifiable rules and names which procedures belong in skills.
Guide
Nothing that fits? Write a prompt with AI.
341 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.
Most are written for ChatGPT (285), Gemini (260), Claude (217) and Claude Code (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.
Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.
By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.
No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.
Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.