Prompt library

336 prompts · last added

12 results for “critical-path”

  • Pricing Pushback Response Playbook with Value Reframe and Concession Rules

    Diagnoses what a price objection really means and builds response scripts, trade-based concession rules, and escalation criteria. It helps a rep decide whether to hold price, trade scope, or walk away.

  • Brutally Honest Red Team for Your Plan or Idea

    Stress-tests a plan with five strong objections, hidden assumptions, the likeliest failure path and the evidence that would change the verdict.

  • Paper Breakdown for Students with Seminar Questions

    Breaks a pasted paper abstract or text into claim, method, key evidence and limitations, then adds three seminar discussion questions.

  • Cursor .mdc Rules to Portable AGENTS.md Converter

    Converts your pasted Cursor .mdc rules into a single AGENTS.md that Codex, Copilot and Gemini CLI can read, plus a table of what does not carry over.

  • Positioning Statement and Messaging Hierarchy for a Product Launch

    Turns product facts, audience insight, and competitor context into a positioning statement, messaging hierarchy, and proof map so a team can approve one launch angle.

  • Rewrite a Vague Issue into a Copilot Coding Agent-Ready Issue

    Turns a vague GitHub issue into a self-contained task with context, testable acceptance criteria, files to touch, and tests to add, so the Copilot coding agent can finish it.

  • Fantasy Landscape Phone Wallpaper

    Makes a detailed fantasy landscape sized for a phone lock screen, with the main subject kept low so the clock and notifications stay readable.

  • Standard Operating Procedure From a Screen-Recording Transcript

    Turns the transcript of a recorded walkthrough into a numbered SOP with prerequisites, steps, screenshots to capture, decision points, and common mistakes, ready for a team wiki.

  • 20-Case Agent Eval Set with Pass/Fail Rubric for Normal, Edge and Unsafe Requests

    Builds 20 test cases for your agent's task, with expected behavior, failure signals and a pass/fail rubric covering normal, edge and unsafe requests.

  • Codebase Tour for a Specific Task

    Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.

  • Example made with AI: A man in a grey overcoat kneels on a sunlit sidewalk to shake hands with a boy who looks like his younger self, in a red windbreaker and yellow backpack.AI-generated example

    Childhood vs Present Handshake

    Creates a cinematic golden-hour scene of your adult self shaking hands with your younger self using your current and childhood photos.

  • Characterization Tests Before a Refactor

    Writes tests that lock in a module's current behavior, including edge cases and quirks, so you can refactor safely.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.