Prompt library

341 prompts · last added

17 results for “risk-register”

  • Short Explainer Video Script With Scene Table and Fact-Check List

    Produces a 60-180 second explainer video script from a brief, with a scene-by-scene table for voiceover and visuals, a fact-check list, and a go/no-go checklist for recording.

  • Brand Voice Guard Skill That Checks Drafts Against VOICE.md (SKILL.md)

    A SKILL.md that makes Claude write and edit in your brand's voice: it reads a VOICE.md in the project, or builds one from samples, then checks every draft against it.

  • Trending

    Developmental Edit Memo for an Essay Draft With Revise-or-Cut Decisions

    Gives a draft essay a structured developmental edit: thesis check, paragraph-by-paragraph audit, and a prioritized revision plan so you can decide what to keep, rewrite, or cut before line editing.

  • Newsletter Issue Builder From Raw Notes and Source Excerpts

    Turns rough notes and supplied source excerpts into a send-ready newsletter issue. It compares lead angles, flags unsupported claims, and ends with a go/no-go checklist before you hit send.

  • Apology Message That Takes Real Responsibility

    Writes a sincere apology for a mistake at work or in personal life that names what happened, owns the impact, avoids excuses and says what changes next.

  • Shorten and Clarify My Email Without Losing Any Request

    Rewrites a long email to roughly half its length, keeps every fact and ask, puts the request up front, and shows what was cut.

  • Make a Paragraph Sound Human: Rewrite Without AI Phrases

    Rewrites any paragraph so it sounds like a real person wrote it, keeping every fact and cutting stock AI phrasing.

  • Long-Form Article Brief With Source Discovery Plan and Citation Table

    Creates an editorial brief and outline for a researched article. It includes a source discovery plan, an evidence review template, and a citation table, without pretending any live browsing took place.

  • Write in My Voice: Style Guide From Three Samples

    Builds a short style guide from three of your writing samples, then writes a new piece in that voice and notes which rules were applied.

  • Firm but Kind Reply to a Difficult Email

    Drafts a calm, polite reply that holds your stated boundary and is hard to misread, with a short version and a misread check.

  • Three-Minute Wedding Toast With a Raise-Your-Glass Ending

    Writes a three-minute wedding toast from your real stories and names, balancing humor and sincerity and ending on a raise-your-glass line.

  • Short Cover Letter Built From Three Proven Wins

    Writes a cover letter under 250 words that links three real achievements from your CV to the role's top requirements, without cliches.

  • Turn Rough Meeting or Project Notes into a Professional Report

    Converts scrappy bullet notes into a clear report with an executive summary, findings, decisions and next steps, without inventing anything.

  • One Message Rewritten for Your Boss, a Client and a Friend

    Takes one piece of news or a request and rewrites it three ways, each matched to the reader's relationship, what they care about and the right level of formality.

  • Polite but Firm Reply to a Difficult or Rude Email

    Drafts a calm reply to a hostile, pushy or unfair email that holds your position, sets a boundary, and moves toward a resolution without escalating.

  • Wedding or Best-Man Speech Built from Your Own Stories

    Shapes your real stories and memories into a three-to-five-minute wedding toast with a clear arc, warm humour, and a closing toast line.

  • Cut 30 Percent: Tighten Text and Show What Was Removed

    Tightens an overlong text by about 30 percent without losing meaning, then lists what was cut and why.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

341 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Claude Code (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.