Prompt library

336 prompts · last added

105 results for “risk-register” · page 1 of 5

  • Project Risk Register and 2-Week Action Plan

    Create a ranked risk register, early warning signs, and a two-week action plan for a project. Supports the go/no-go and resourcing decision at the next checkpoint.

  • Executive Decision Memo Builder With Options, Risks, and Recommendation

    Turns a pending business decision into a one-page-style decision memo with scored options, explicit assumptions, risks, missing information, a recommendation, and next actions an executive can approve or reject.

  • Write a SKILL.md From a Workflow You Keep Repeating

    Interviews you about a task you do over and over, then writes a complete, save-ready SKILL.md with a trigger description, steps, output format and stop conditions.

  • Plan Before Edit: Cursor Plan-Mode Prompt for a Feature Request

    Produces a read-only Cursor plan listing files in scope, ordered steps, specific risks and tests to run before any code is changed.

  • Repetitive Task to Zapier, n8n or Make Automation Spec

    Turns a repetitive task into a build-ready automation spec with triggers, AI steps, human checkpoints, failure handling and a test plan.

  • Unit Test Plan and Test Code for an Existing Function

    Builds a behavior-based test matrix for a function or module and then generates test code in your framework. Covers edge cases, failures, and mocking boundaries, with coverage gaps stated honestly.

  • Topic Cluster Map: Pillar and Supporting Pages Ranked by Build Order

    Build a topic cluster from a keyword list and existing content, then rank which cluster and pages to create first. It includes a keyword-to-page mapping table, internal link rules, and cannibalization risks.

  • Operations Bottleneck Diagnosis and 30-Day Process Fix Plan

    Diagnoses where a workflow slows down using your process steps and metrics, then ranks causes and produces a 30-day improvement plan with owners, measures, and risks.

  • Codex Read-Only Repo Investigation for a Bug Report

    Runs a read-only Codex investigation that maps the relevant code paths, test commands, and likely root causes for a bug report. It ends with a ranked hypothesis table and a go/no-go recommendation before any edits.

  • Contract and Lease Plain-English Clause Review

    Explains each clause of a pasted contract or lease in plain English, flags one-sided terms and lists questions to ask before signing.

  • Brutally Honest Red Team for Your Plan or Idea

    Stress-tests a plan with five strong objections, hidden assumptions, the likeliest failure path and the evidence that would change the verdict.

  • Codex Pull Request Review With Comments Ranked by Severity

    Has Codex review a pull request and return comments sorted into blocking, should-fix and nit, each with the file and line, the risk, and a suggested change.

  • Cursor Agent Bug Triage: Reproduce, Root-Cause, Fix, and Regression Test

    Guides Cursor Agent through reproducing a bug, isolating the root cause with evidence, applying a minimal diff, and adding a regression test, ending with a verification checklist and risks.

  • Pricing Change Decision Memo with Scenario Math and Test Plan

    Turns current pricing, cost, and customer data into a decision memo comparing hold, adjust, and repackage options, with scenario math, risks, and a controlled pricing test plan.

  • Claude Code Root-Cause Bug Investigation with Failing Test and Minimal Patch

    Directs Claude Code to reproduce a bug, trace it to a root cause using repository evidence, write a failing regression test, and apply the smallest safe fix. Ends with a verified diff, risks, and next actions.

  • Business Idea Validation Sprint with a $100 Two-Week Test

    Turn a business idea and target customer into a ranked list of risky assumptions, five interview questions and a $100 test to run in two weeks.

  • Conventional Commit and PR Description from a Diff and Ticket

    Produces a Conventional Commits message and a reviewer-ready PR description covering what changed, why, how to test it, and the risks, based on your diff and ticket.

  • Salary Negotiation Script With Replies to the Five Most Likely Counteroffers

    Builds a negotiation script for a job offer: your anchor number with a reason, word-for-word replies to common pushback, and a walk-away line, using market data you supply.

  • Diagnostic Quiz Builder with Answer Key and Misconception Remediation

    Turns your source material into a diagnostic quiz with an answer key, a misconception map, and a reteach plan. It helps you decide who needs review and what to reteach.

  • Short Explainer Video Script With Scene Table and Fact-Check List

    Produces a 60-180 second explainer video script from a brief, with a scene-by-scene table for voiceover and visuals, a fact-check list, and a go/no-go checklist for recording.

  • Custom GPT Blueprint: Instructions, Knowledge Files, and Test Cases

    Plan a custom GPT before building it. Produces the instruction text, knowledge file plan, conversation starters, and a test set so you can decide whether to build, narrow, or skip it.

  • Three-Tier Pricing for a Small Service or SaaS With Reasons for Each Line

    Designs Good-Better-Best pricing for your service or SaaS: what goes in each tier, price points with reasoning, the tier you want most people to pick, and what to test first.

  • Rewrite a Vague Issue into a Copilot Coding Agent-Ready Issue

    Turns a vague GitHub issue into a self-contained task with context, testable acceptance criteria, files to touch, and tests to add, so the Copilot coding agent can finish it.

  • Salary Counteroffer Email, Call Script and Pushback Replies

    Turn your job offer and target number into a polite counteroffer email, phone talking points and replies to the three likeliest pushbacks.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.