Prompt library

336 prompts · last added

24 results for “critical-path”

  • Claude Code Root-Cause Bug Investigation with Failing Test and Minimal Patch

    Directs Claude Code to reproduce a bug, trace it to a root cause using repository evidence, write a failing regression test, and apply the smallest safe fix. Ends with a verified diff, risks, and next actions.

  • Implement a Scoped Feature in Copilot Agent Mode with Repo Discovery and Tests

    Guides GitHub Copilot agent mode to inspect the repository, state assumptions, plan a minimal change, implement it, and add tests. It ends with a verification report you can use to decide whether to open a PR.

  • Brutally Honest Red Team for Your Plan or Idea

    Stress-tests a plan with five strong objections, hidden assumptions, the likeliest failure path and the evidence that would change the verdict.

  • Cursor Project Rules Generator for Your Repo's Stack

    Has Cursor inspect your repository and write 3-5 scoped .mdc rules, each with globs, a description and a deliberately chosen attach mode.

  • Cursor .mdc Rules to Portable AGENTS.md Converter

    Converts your pasted Cursor .mdc rules into a single AGENTS.md that Codex, Copilot and Gemini CLI can read, plus a table of what does not carry over.

  • Edge-Case Test Suite for One Function in Your Existing Test Framework

    Writes tests for a single function that cover normal inputs, boundaries, bad input and error paths, in the test framework your project already uses.

  • Positioning Statement and Messaging Hierarchy for a Product Launch

    Turns product facts, audience insight, and competitor context into a positioning statement, messaging hierarchy, and proof map so a team can approve one launch angle.

  • Codex Read-Only Repo Investigation for a Bug Report

    Runs a read-only Codex investigation that maps the relevant code paths, test commands, and likely root causes for a bug report. It ends with a ranked hypothesis table and a go/no-go recommendation before any edits.

  • Explain a Codebase Folder to a New Developer on Their First Day

    Produces an onboarding guide for one folder of a codebase: what it does, how data moves through it, the files to read first and the traps a new developer should avoid.

  • Cursor Agent Bug Triage: Reproduce, Root-Cause, Fix, and Regression Test

    Guides Cursor Agent through reproducing a bug, isolating the root cause with evidence, applying a minimal diff, and adding a regression test, ending with a verification checklist and risks.

  • Typed Phase Handoff Contracts and Validator for Multi-Agent Pipelines

    Has Claude Code define schema-based handoff contracts between agent phases, generate a validator, and add contract tests. Supports the decision of which phase boundaries need strict contracts versus lightweight checks.

  • Rewrite a Vague Issue into a Copilot Coding Agent-Ready Issue

    Turns a vague GitHub issue into a self-contained task with context, testable acceptance criteria, files to touch, and tests to add, so the Copilot coding agent can finish it.

  • Cursor Refactor of a Component With Zero Behaviour Change

    Has the Cursor agent restructure a messy component into smaller pieces while proving the behaviour stays identical, using existing tests or new characterization tests first.

  • Spreadsheet and CSV Cleanup Report Skill (SKILL.md)

    A SKILL.md that has your agent profile a messy CSV or spreadsheet, fix it in a copy with a script, and report every change so the cleaned data can be trusted.

  • Test-First Bug Fix Skill: Reproduce, Fix, Prove (SKILL.md)

    A SKILL.md that forces your coding agent to reproduce a bug with a failing test before changing code, apply the smallest fix, and prove it with the test suite.

  • Unit Test Plan and Test Code for an Existing Function

    Builds a behavior-based test matrix for a function or module and then generates test code in your framework. Covers edge cases, failures, and mocking boundaries, with coverage gaps stated honestly.

  • Executive Decision Memo Builder With Options, Risks, and Recommendation

    Turns a pending business decision into a one-page-style decision memo with scored options, explicit assumptions, risks, missing information, a recommendation, and next actions an executive can approve or reject.

  • Pre-PR Self-Review and Pull Request Description from a Git Diff

    Has GitHub Copilot review your branch diff against the base branch, flag defects and missing tests, and draft a PR description with evidence. Use it to decide whether to open the PR or fix issues first.

  • Write a SKILL.md From a Workflow You Keep Repeating

    Interviews you about a task you do over and over, then writes a complete, save-ready SKILL.md with a trigger description, steps, output format and stop conditions.

  • Plan Before Edit: Cursor Plan-Mode Prompt for a Feature Request

    Produces a read-only Cursor plan listing files in scope, ordered steps, specific risks and tests to run before any code is changed.

  • Outcome-First Codex Task Writer for a Feature or Bug Request

    Turns a raw feature or bug request into a paste-ready Codex task with a goal, constraints, files in scope, definition of done and exact verification commands.

  • Interview Me Then Plan: Requirements Interview Before Any Code

    Claude Code questions you about a feature's requirements and edge cases, then delivers an implementation plan with acceptance criteria and test commands, without writing code first.

  • Codebase Tour for a Specific Task

    Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.

  • Custom Slash Command Builder for Repeated Claude Code Tasks

    Turns a task you repeat into a custom slash command file with frontmatter, arguments, restricted allowed tools and a fixed output format.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.