Codex Exec CI Fixer: Diagnose, Minimal Fix, Rerun, Stop After 3 Attempts
Gives codex exec a non-interactive procedure to diagnose a failing CI output, apply a minimal fix, rerun the checks and stop after three attempts with a clear report.
341 prompts · last added
51 results for “risk-register” · page 2 of 3
Gives codex exec a non-interactive procedure to diagnose a failing CI output, apply a minimal fix, rerun the checks and stop after three attempts with a clear report.
Produces a PostToolUse hook entry for settings.json, the script it calls and a concrete procedure to test that the check runs after file edits.
Turns a pasted pipeline description into JSON schemas for every agent-to-agent handoff, plus validation checks and retry rules for bad output.
Splits a research question across parallel research agents, defines source discovery and evidence review steps, merges findings into a citation table, and produces a decision memo without claiming live browsing.
Converts a scene idea into a numbered storyboard and per-shot prompts for AI video generators, with consistency anchors to reduce character and style drift between clips.
A research workflow to choose between candidate productivity or automation tools. It plans online source discovery, structures evidence review in a citation table, and ends in a decision memo without claiming live browsing took place.
Produces a least-privilege tool inventory, function definitions, and approval rules for an agent that calls APIs or internal systems.
Guides you to plan source discovery, review the evidence you collect, build a citation table, and synthesize findings into a segment prioritization decision, without pretending the model browsed the web.
Tests a specific claim or statistic against primary and peer-reviewed sources. Produces an evidence grid, a contradiction log, and a calibrated confidence rating with explicit unknowns.
Has Cursor lock in current behavior with characterization tests before restructuring a legacy module in small steps, so you can decide whether the refactor preserved behavior and is safe to merge.
Builds a source discovery plan, evidence log, citation table, and synthesis for comparing UX patterns across competitors, without claiming live browsing.
Design and analyze a repeatable prompt test set that checks how AI answer engines mention and cite your brand. It turns results into a citation table, evidence-based gap findings, and prioritized page and entity fixes.
Turn a crawl export and Search Console data into a scored, sprint-ready technical SEO fix list. It separates facts from assumptions and flags what needs verification before developers start work.
Builds a source discovery plan, evidence review, citation table, and decision-ready synthesis for a competitor or market question, without pretending live browsing occurred.
Creates an editorial brief and outline for a researched article. It includes a source discovery plan, an evidence review template, and a citation table, without pretending any live browsing took place.
Build a research plan that shows where to find competitor evidence, how to judge sources, and how to log citations. It never claims live browsing happened, so you can verify each source yourself.
Runs a behavior-preserving refactor in Codex exec. It pins current behavior with characterization tests, refactors in small verified steps inside an allowed scope, and ends with an evidence-based handoff for the merge decision.
Guides Claude Code to build or refactor a dependency-aware DAG scheduler for agent phases, with cycle validation, bounded parallelism, join policies, retries, and an append-only run ledger so interrupted runs resume without redoing finished nodes.
Combines your Docs, Sheets, meeting notes, and outside sources into one decision memo. Separates internal evidence from external research and logs conflicts, gaps, and next actions.
Has Gemini inspect uploaded images, screenshots, charts, and PDFs, extract what is visible, and verify claims against online sources. Ends in a findings log with confidence ratings and next steps.
Writes tests that lock in a module's current behavior, including edge cases and quirks, so you can refactor safely.
Writes a ready-to-deploy orchestrator system prompt that delegates to your workers, tracks progress in a ledger, merges results and stops on defined conditions.
Compares competitor homepage copy with your positioning to map overlap, find unclaimed angles, and propose one sharper differentiating line.
Builds a source discovery plan, evidence review, and citation table for a video's factual claims so a producer can decide which claims to keep, soften, or cut before scripting.
Guide
Nothing that fits? Write a prompt with AI.
341 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.
Most are written for ChatGPT (285), Gemini (260), Claude (217) and Claude Code (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.
Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.
By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.
No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.
Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.