Prompt library

336 prompts · last added

43 results for “risk-register” · page 1 of 2

  • Recurring Workflow to SKILL.md with Trigger, Steps and Verification

    Claude Code interviews you briefly about a repeated workflow and writes a complete SKILL.md with a precise trigger description, steps, supporting files and a verification step.

  • Repetitive Task to Zapier, n8n or Make Automation Spec

    Turns a repetitive task into a build-ready automation spec with triggers, AI steps, human checkpoints, failure handling and a test plan.

  • Business Idea Validation Sprint with a $100 Two-Week Test

    Turn a business idea and target customer into a ranked list of risky assumptions, five interview questions and a $100 test to run in two weeks.

  • Codebase Tour for a Specific Task

    Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.

  • Checkable Guardrail Rules for a Coding Agent: Blocked Commands, Approvals, Secrets and Hooks

    Produces a set of testable guardrail rules for your coding agent, covering blocked commands, approval gates, secret handling and hook checks.

  • Beginner Three-Day Gym Program with Progression for 8 Weeks

    Creates a simple full-body program for three gym days a week, with sets, reps, rest, how to add weight, and easier swaps for each exercise.

  • Codex Writes an AGENTS.md for This Repository From the Real Setup

    Has Codex inspect your repository and write a short, accurate AGENTS.md with the real build, test and lint commands, conventions and boundaries, checked by actually running them.

  • Pre-Merge Code Review Checklist Skill (SKILL.md)

    A save-ready SKILL.md that has your coding agent review a branch before merge: correctness, security, tests and migrations, with findings ranked by severity and no style nitpicks.

  • Weighted Decision Matrix with Pre-Mortem on the Winner

    Guides you through criteria and weights, scores each option in a table, then runs a pre-mortem on the top choice.

  • Brand Voice Guard Skill That Checks Drafts Against VOICE.md (SKILL.md)

    A SKILL.md that makes Claude write and edit in your brand's voice: it reads a VOICE.md in the project, or builds one from samples, then checks every draft against it.

  • Conventional Commit and PR Description Writer Skill (SKILL.md)

    A ready-to-save SKILL.md that makes your coding agent write Conventional Commits messages and pull request descriptions from the staged diff, never from guesses.

  • Release Notes From Git Log Skill for Users and Developers (SKILL.md)

    A SKILL.md that writes release notes from the commits between two tags, split into a plain-language section for users and a technical changelog for developers.

  • Test-First Bug Fix Skill: Reproduce, Fix, Prove (SKILL.md)

    A SKILL.md that forces your coding agent to reproduce a bug with a failing test before changing code, apply the smallest fix, and prove it with the test suite.

  • Codex Exec CI Fixer: Diagnose, Minimal Fix, Rerun, Stop After 3 Attempts

    Gives codex exec a non-interactive procedure to diagnose a failing CI output, apply a minimal fix, rerun the checks and stop after three attempts with a clear report.

  • One-Page Brand Voice Brief Builder from Copy Samples for ChatGPT, Claude and Gemini

    Analyzes your brand copy samples and builds a reusable one-page voice brief with tone rules, banned words, example rewrites and a paste-ready instruction block.

  • Claude Code Hook Writer: Auto-Run Lint, Typecheck or Tests After Edits

    Produces a PostToolUse hook entry for settings.json, the script it calls and a concrete procedure to test that the check runs after file edits.

  • Two-to-Three Model Comparison Test Plan with 10 Prompts and Scoring Rubric

    Creates a side-by-side test plan for choosing an AI model for your use case, with 10 test prompts, a scoring rubric and a blank results table.

  • Eight-Objection Handling Playbook: Acknowledge, Ask, Reframe, Evidence

    Builds a playbook that answers the eight most likely objections for your product and buyer, each in four steps with honest evidence.

  • Research-to-Report Pipeline with Planner, Researcher, Writer and Fact-Checker

    Designs a four-agent pipeline for your report type with each agent's prompt, inputs, outputs and handoff format.

  • Spreadsheet and CSV Cleanup Report Skill (SKILL.md)

    A SKILL.md that has your agent profile a messy CSV or spreadsheet, fix it in a copy with a script, and report every change so the cleaned data can be trusted.

  • Backward Exam Revision Plan with Spaced Reviews and Timed Practice

    Builds a day-by-day revision calendar that counts back from your exam date, with spaced reviews and timed practice sessions.

  • Write in My Voice: Style Guide From Three Samples

    Builds a short style guide from three of your writing samples, then writes a new piece in that voice and notes which rules were applied.

  • Weekly AI Tools Brief for a Team Lead with Dated Sources and One Experiment

    Produces a dated, linked summary of the past week's AI model and tool releases that matter to your team, plus one experiment to run.

  • Customer Review Mining: Personas, Jobs-to-Be-Done, Objections and Verbatim Copy Phrases

    Turns pasted customer reviews into evidence-based personas, jobs-to-be-done, objections and a bank of exact customer phrases ready to reuse in copy.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.