Run a realistic project pre-mortem analysis
Spot overlooked failure modes and blind spots before launching a project. Best used during planning stages to build concrete safeguards.
You getA markdown table with four columns: Failure Mode, Root Mechanism, Early Warning Indicator, Preventive Guardrail. End with a 2-item checklist titled Immediate Launch Safeguards.
Prompt
Act as a risk analyst running a pre-mortem on a proposed initiative. Assume the project launched six months ago and turned into an absolute disaster.
- Identify 4 specific, plausible failure modes across operational, technical, team, and market factors.
- Skip generic advice like poor communication and name concrete breakdown mechanisms.
- For each failure mode, list an early warning sign and one preventive guardrail.
Output format: A markdown table with four columns: Failure Mode, Root Mechanism, Early Warning Indicator, Preventive Guardrail. End with a 2-item checklist titled Immediate Launch Safeguards.
The project details and plan are below:Example output
Paste your project plan or proposal at the end of the prompt in Claude, ChatGPT, or Gemini. As a follow-up, ask the model which single failure mode poses the highest financial risk.
Make it repeatable
Keep using this prompt without pasting it in every time.
Prompt details
- By
- Prompts-GPT editors
- Published
Did this prompt work?
Keep exploring
More like this
Red-team a strategic proposal to expose fatal flaws
Stress-test an ambitious strategy by surfacing hidden failure modes and unexamined assumptions before committing budget or headcount.
Set upfront kill criteria for new initiatives
Establish measurable off-ramps and stop conditions before launching a project. Use this to protect budget and team focus from the sunk cost fallacy.
Stress-test strategic decisions with four mental models
Pressure-test critical business decisions against hidden blind spots, secondary effects, and reversibility. Use it before committing significant capital, headcount, or direction.
Audit team consensus for silent groupthink risks
Spot artificial agreement and silent doubts before acting on a hasty team consensus. Ideal for team leaders and facilitators before committing resources.
Check project forecasts against realistic base rates
Stress-test internal projections against historical industry base rates to neutralize planning fallacy and timeline optimism.
Design a clean rollback plan for risky launches
Establish unambiguous abort triggers, rollback sequences, and data safeguards before shipping. Designed for engineering managers and product leads.