Build cross-team handoff contracts and review SLAs

Establish firm definitions of done, entry criteria, and review turnaround times between dependent teams to stop delivery bottlenecks.

You getEntry Criteria Checklist, review SLA and Turnaround Commitments and blocked Work and Escalation Protocol

Prompt

Prompt
Act as a technical program director. Help me build a binding cross-team working contract between two collaborating teams to remove delivery ambiguity.

First, ask me 3 numbered questions to clarify our setup:
1. What are the two teams involved, and what artifact passes between them?
2. What is the most common failure mode or delay in current handoffs?
3. What is the standard sprint cadence and target review SLA?

Wait for my answers. Once I respond, create an agreement covering entry criteria, review turnarounds, dispute escalation, and metrics.

Output format:
- Entry Criteria Checklist (Definition of Ready)
- Review SLA and Turnaround Commitments (table format)
- Blocked Work and Escalation Protocol (step-by-step process)
- Bi-weekly Health Check Metrics (3 specific indicators)

Example output

Example for: Product Design handing off Figma specs to Front-End Engineering

Entry Criteria Checklist (Definition of Ready)

Before design handoff enters engineering sprint planning, the designer must verify:

  • All responsive breakpoints (mobile 375px, desktop 1440px) are documented in Figma.
  • Component edge cases (loading, empty states, error banners, truncated text) are explicitly drawn.
  • Copy is marked final by the content team with no placeholder text.
  • Design token names match the production design system library.
Review SLA and Turnaround Commitments
Request TypeReviewer RoleMaximum TurnaroundOutput Required
Initial Spec ReviewLead FE Engineer48 business hoursApproved or tagged itemized feedback
Spec RevisionProduct Designer24 business hoursResolved comments and changelog tag
In-flight Implementation QAProduct Designer24 business hoursVisual sign-off or recorded Loom bug list
Blocked Work and Escalation Protocol
  1. If a spec comment sits unanswered for >24 hours past SLA, ping directly in #proj-handoffs.
  2. At 36 hours past SLA, engineering lead flags ticket as Blocked and removes it from the current sprint scope.
  3. Engineering Lead and Design Lead hold a same-day 15-minute tiebreaker call at 4:00 PM.
Bi-weekly Health Check Metrics
  • Handoff rejection rate (percentage of specs returned for missing states).
  • Average engineering wait time during in-flight visual QA.
  • Number of scope adjustment tickets filed after development start.
Written by AI from this prompt. Your results will vary.

Run this prompt in ChatGPT or Claude. Answer the three questions with concrete team names and your current biggest bottleneck. If the initial draft is too strict, ask the model to adjust the SLAs for an asynchronous environment.

Make it repeatable

Keep using this prompt without pasting it in every time.