Build a Team Capacity Model Subtracting PTO and Overhead
You get a quarterly capacity table comparing net available hours against roadmap demand, plus three concrete scope-cut options.
Text prompt for ChatGPT and Claude
Prompt
Act as an engineering operations manager building a realistic quarterly capacity plan.
Your job is to calculate net available team hours after subtracting non-project overhead, compare that against roadmap demand, and propose scope cuts if demand exceeds capacity.
First, ask me these 4 short questions in one numbered message and wait for my reply:
1. How many full-time team members do you have, and how many working weeks are in the quarter?
2. What are your estimated hours or percentages for PTO, holidays, on-call support, and routine maintenance?
3. What are your top roadmap initiatives and their estimated hour requirements?
4. Which initiatives are hard commitments versus flexible?
Rules:
- Calculate gross hours first, then subtract PTO, holidays, on-call, and maintenance before comparing to roadmap demand.
- Show all math clearly using a 40-hour workweek unless I specify otherwise.
- Flag any deficit in both hours and percentage of net capacity.
- Provide three distinct scope-cut options ranked from lowest to highest business impact.
Output format:
- Capacity Summary (gross hours, each deduction, net available hours)
- Quarterly Gap Table (columns: Initiative, Estimated Hours, Priority, Status)
- Three Scope-Cut Options (numbered list with hours saved and trade-off for each)
End with one line noting any assumptions made or missing inputs that could shift the numbers.Example output
Tips and common edits
Why this works
- Forces overhead deductions before comparing to roadmap hours, preventing optimistic planning.
- Asks four targeted questions upfront so the math reflects your actual team size and commitments.
- Requires three ranked scope-cut options with explicit trade-offs instead of generic advice.
Use this during quarterly planning in ChatGPT, Claude, or Gemini. Have your headcount, rough PTO estimates, on-call rotation load, and initiative hour estimates ready to paste.
Common edits
- Change the default 40-hour workweek to 32 or 35 hours if your team uses focus-hour benchmarks.
- Add a question about planned hiring or onboarding ramp time if new team members join mid-quarter.
Reuse it: Use in a workflowTurn into a skillAdapt in the builder
Prompt details
- By
- Prompts-GPT editors
- Published
Did this prompt work?
More like this
Turn a Team Skills Survey into a Prioritised Training Plan with Budget
You get a ranked list of team skill gaps and a costed quarterly training schedule that mixes internal mentoring with paid external courses.
Build a quarterly team skills matrix and gap analysis
Identify single points of failure, missing competencies, and high-priority cross-training targets across your team roster.
Create a post-crunch team recovery sprint plan
Design a two-week reset sprint to help teams recuperate after an intense deadline push. Use this to tackle low-stress tech debt, clear mental fatigue, and restore sustainable momentum.
Distribute invisible glue work across your team
Audit uncredited coordination, onboarding, and documentation duties to protect high performers from burnout. Use this when reliable contributors carry too much operational weight.
Prepare promotion calibration talking points for leadership
Build defensible calibration arguments to counter tough leadership objections and secure your direct report's promotion.
Structure a dedicated monthly career growth conversation
Run structured, 45-minute monthly career development sessions that stay separate from tactical work and bug fixes. Use this to maintain consistent growth trajectories for engineers.
- Build an Hour-by-Hour First-Shift Floor Buddy Plan for New Starters
- Draft an Annual Operating Plan with Paired Cuts and Risk Triggers
- Draft Three Shift-Swap and Time-Off Reply Variants for Hourly Teams
- Grade Quarterly OKRs on a 0-1 Scale With Evidence and Retro
- Write a Specific Shift Recognition Message Tied to One Moment
- Build a thirty-sixty-ninety day onboarding plan