Prompt library

336 prompts · last added

64 results for “risk-register” · page 1 of 3

  • Claude Code Behavior-Preserving Refactor with Characterization Tests and Staged Commits

    Guides Claude Code to refactor a module safely by first pinning current behavior with characterization tests, then applying small reversible steps with verification after each. Delivers a diff, risk register, and rollback plan.

  • Recurring Workflow to SKILL.md with Trigger, Steps and Verification

    Claude Code interviews you briefly about a repeated workflow and writes a complete SKILL.md with a precise trigger description, steps, supporting files and a verification step.

  • Cursor Incremental Dependency Migration Plan and Codemod Execution

    Plans and executes a library or framework version migration in Cursor in small, verifiable batches, with an impact inventory, rollback points, and per-batch test gates instead of one risky bulk edit.

  • Dependency Graph Planner for a Multi-Agent Software Release Workflow

    Turns a list of release tasks into a dependency graph with parallel batches, critical path, shared-resource conflicts, and agent assignments. Supports the decision on what to run now versus wait on.

  • Codex Pre-Merge Diff Review with Severity-Ranked Findings

    Has Codex review a branch diff against a base ref in read-only mode. It checks correctness, tests, security, and maintainability, and returns evidence-backed findings with severity and a merge recommendation.

  • Write a SKILL.md From a Workflow You Keep Repeating

    Interviews you about a task you do over and over, then writes a complete, save-ready SKILL.md with a trigger description, steps, output format and stop conditions.

  • Plan Before Edit: Cursor Plan-Mode Prompt for a Feature Request

    Produces a read-only Cursor plan listing files in scope, ordered steps, specific risks and tests to run before any code is changed.

  • Unit Test Plan and Test Code for an Existing Function

    Builds a behavior-based test matrix for a function or module and then generates test code in your framework. Covers edge cases, failures, and mocking boundaries, with coverage gaps stated honestly.

  • Codex Read-Only Repo Investigation for a Bug Report

    Runs a read-only Codex investigation that maps the relevant code paths, test commands, and likely root causes for a bug report. It ends with a ranked hypothesis table and a go/no-go recommendation before any edits.

  • Coding Agent Task Brief with Guardrails, Test Plan, and Rollback Steps

    Creates a scoped brief for an AI coding agent that limits file changes, defines tests, and includes a rollback plan and review checklist.

  • Parallel Git Worktree Task Split with Interface Contracts and Merge Order

    Turns a pasted feature spec into independent coding-agent tasks with file ownership, interface contracts, a merge order and a done command for each task.

  • Codex Pull Request Review With Comments Ranked by Severity

    Has Codex review a pull request and return comments sorted into blocking, should-fix and nit, each with the file and line, the risk, and a suggested change.

  • Cursor Agent Bug Triage: Reproduce, Root-Cause, Fix, and Regression Test

    Guides Cursor Agent through reproducing a bug, isolating the root cause with evidence, applying a minimal diff, and adding a regression test, ending with a verification checklist and risks.

  • Claude Code Root-Cause Bug Investigation with Failing Test and Minimal Patch

    Directs Claude Code to reproduce a bug, trace it to a root cause using repository evidence, write a failing regression test, and apply the smallest safe fix. Ends with a verified diff, risks, and next actions.

  • Conventional Commit and PR Description from a Diff and Ticket

    Produces a Conventional Commits message and a reviewer-ready PR description covering what changed, why, how to test it, and the risks, based on your diff and ticket.

  • GitHub Copilot Pull Request Description Written From the Diff

    Turns the changes in a branch into a clear pull request description: what changed and why, how to test it, risks and screenshots to add, in your repo's template if it has one.

  • Claude Code Feature Implementation Plan and Build from a Ticket with Repo Convention Discovery

    Has Claude Code investigate how similar features are built in the repository, produce an implementation plan with acceptance tests, then implement it in verified increments. Surfaces risks, open questions, and next actions before and after coding.

  • Rewrite a Vague Issue into a Copilot Coding Agent-Ready Issue

    Turns a vague GitHub issue into a self-contained task with context, testable acceptance criteria, files to touch, and tests to add, so the Copilot coding agent can finish it.

  • CLAUDE.md or AGENTS.md Audit: Cut, Rewrite as Checkable Rules, Move to Skills

    Turns a pasted CLAUDE.md or AGENTS.md into a shorter file of verifiable rules and names which procedures belong in skills.

  • Codebase Tour for a Specific Task

    Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.

  • Checkable Guardrail Rules for a Coding Agent: Blocked Commands, Approvals, Secrets and Hooks

    Produces a set of testable guardrail rules for your coding agent, covering blocked commands, approval gates, secret handling and hook checks.

  • Codex Writes an AGENTS.md for This Repository From the Real Setup

    Has Codex inspect your repository and write a short, accurate AGENTS.md with the real build, test and lint commands, conventions and boundaries, checked by actually running them.

  • Pre-Merge Code Review Checklist Skill (SKILL.md)

    A save-ready SKILL.md that has your coding agent review a branch before merge: correctness, security, tests and migrations, with findings ranked by severity and no style nitpicks.

  • Brand Voice Guard Skill That Checks Drafts Against VOICE.md (SKILL.md)

    A SKILL.md that makes Claude write and edit in your brand's voice: it reads a VOICE.md in the project, or builds one from samples, then checks every draft against it.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.