Prompt library

336 prompts · last added

40 results for “critical-path” · page 1 of 2

  • Dependency Graph Planner for a Multi-Agent Software Release Workflow

    Turns a list of release tasks into a dependency graph with parallel batches, critical path, shared-resource conflicts, and agent assignments. Supports the decision on what to run now versus wait on.

  • Cursor Characterization-Test-First Refactor of a Legacy Module

    Has Cursor lock in current behavior with characterization tests before restructuring a legacy module in small steps, so you can decide whether the refactor preserved behavior and is safe to merge.

  • Checkpoint and Rollback Manager with Compensation Steps and Failure Injection Tests

    Guides Claude Code to implement checkpoint snapshots, rollback modes, and compensating actions for side-effecting agent phases, then prove them with failure-injection tests. Helps you decide the rollback strategy per phase.

  • Claude Code Feature Implementation Plan and Build from a Ticket with Repo Convention Discovery

    Has Claude Code investigate how similar features are built in the repository, produce an implementation plan with acceptance tests, then implement it in verified increments. Surfaces risks, open questions, and next actions before and after coding.

  • Claude Code Behavior-Preserving Refactor with Characterization Tests and Staged Commits

    Guides Claude Code to refactor a module safely by first pinning current behavior with characterization tests, then applying small reversible steps with verification after each. Delivers a diff, risk register, and rollback plan.

  • Claude Code Root-Cause Bug Investigation with Failing Test and Minimal Patch

    Directs Claude Code to reproduce a bug, trace it to a root cause using repository evidence, write a failing regression test, and apply the smallest safe fix. Ends with a verified diff, risks, and next actions.

  • Implement a Scoped Feature in Copilot Agent Mode with Repo Discovery and Tests

    Guides GitHub Copilot agent mode to inspect the repository, state assumptions, plan a minimal change, implement it, and add tests. It ends with a verification report you can use to decide whether to open a PR.

  • Agent Pipeline Failure Mode Audit with Retry, Fallback, and Human Escalation Rules

    Audits an existing multi-agent pipeline for failure modes and produces retry limits, fallback paths, escalation triggers, and a test plan. Supports the decision on what to harden before wider rollout.

  • Cursor Incremental Dependency Migration Plan and Codemod Execution

    Plans and executes a library or framework version migration in Cursor in small, verifiable batches, with an impact inventory, rollback points, and per-batch test gates instead of one risky bulk edit.

  • Codex Characterization-Test-First Refactor with Verification Handoff

    Runs a behavior-preserving refactor in Codex exec. It pins current behavior with characterization tests, refactors in small verified steps inside an allowed scope, and ends with an evidence-based handoff for the merge decision.

  • Cursor Project Rules Generator for Your Repo's Stack

    Has Cursor inspect your repository and write 3-5 scoped .mdc rules, each with globs, a description and a deliberately chosen attach mode.

  • Claude Code Hook Writer: Auto-Run Lint, Typecheck or Tests After Edits

    Produces a PostToolUse hook entry for settings.json, the script it calls and a concrete procedure to test that the check runs after file edits.

  • Cursor .mdc Rules to Portable AGENTS.md Converter

    Converts your pasted Cursor .mdc rules into a single AGENTS.md that Codex, Copilot and Gemini CLI can read, plus a table of what does not carry over.

  • Edge-Case Test Suite for One Function in Your Existing Test Framework

    Writes tests for a single function that cover normal inputs, boundaries, bad input and error paths, in the test framework your project already uses.

  • Codex Read-Only Repo Investigation for a Bug Report

    Runs a read-only Codex investigation that maps the relevant code paths, test commands, and likely root causes for a bug report. It ends with a ranked hypothesis table and a go/no-go recommendation before any edits.

  • Explain a Codebase Folder to a New Developer on Their First Day

    Produces an onboarding guide for one folder of a codebase: what it does, how data moves through it, the files to read first and the traps a new developer should avoid.

  • Coding Agent Task Brief with Guardrails, Test Plan, and Rollback Steps

    Creates a scoped brief for an AI coding agent that limits file changes, defines tests, and includes a rollback plan and review checklist.

  • Cursor Agent Bug Triage: Reproduce, Root-Cause, Fix, and Regression Test

    Guides Cursor Agent through reproducing a bug, isolating the root cause with evidence, applying a minimal diff, and adding a regression test, ending with a verification checklist and risks.

  • Root Cause Analysis from Stack Trace and Logs

    Turns an error report, stack trace, and logs into ranked root-cause hypotheses. Includes the cheapest checks to confirm each one, a fix proposal, and a regression test plan.

  • Codex CI Failure Triage: Reproduce, Classify, Fix or Hand Off

    Guides Codex through reproducing a failing CI job locally, classifying the cause as code, test, environment, or flaky, applying a minimal fix when safe, and producing an evidence-based handoff for anything it cannot resolve.

  • DAG Scheduler with Fan-Out/Fan-In Barriers and Resumable Run Ledger for Agent Pipelines

    Guides Claude Code to build or refactor a dependency-aware DAG scheduler for agent phases, with cycle validation, bounded parallelism, join policies, retries, and an append-only run ledger so interrupted runs resume without redoing finished nodes.

  • Typed Phase Handoff Contracts and Validator for Multi-Agent Pipelines

    Has Claude Code define schema-based handoff contracts between agent phases, generate a validator, and add contract tests. Supports the decision of which phase boundaries need strict contracts versus lightweight checks.

  • Rewrite a Vague Issue into a Copilot Coding Agent-Ready Issue

    Turns a vague GitHub issue into a self-contained task with context, testable acceptance criteria, files to touch, and tests to add, so the Copilot coding agent can finish it.

  • Recurring Workflow to SKILL.md with Trigger, Steps and Verification

    Claude Code interviews you briefly about a repeated workflow and writes a complete SKILL.md with a precise trigger description, steps, supporting files and a verification step.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.