Prompt library

341 prompts · last added

195 results for “risk-register” · page 6 of 9

  • Cursor Characterization-Test-First Refactor of a Legacy Module

    Has Cursor lock in current behavior with characterization tests before restructuring a legacy module in small steps, so you can decide whether the refactor preserved behavior and is safe to merge.

  • Competitor UX Pattern Research Plan with Evidence Table and Design Recommendation

    Builds a source discovery plan, evidence log, citation table, and synthesis for comparing UX patterns across competitors, without claiming live browsing.

  • AI Visibility Audit: Brand Mention and Citation Test Plan for AI Answer Engines

    Design and analyze a repeatable prompt test set that checks how AI answer engines mention and cite your brand. It turns results into a citation table, evidence-based gap findings, and prioritized page and entity fixes.

  • Technical SEO Crawl Triage: Prioritized Fix Plan for the Next Sprint

    Turn a crawl export and Search Console data into a scored, sprint-ready technical SEO fix list. It separates facts from assumptions and flags what needs verification before developers start work.

  • Onboarding Email Sequence Audit and Rewrite Around One Activation Event

    Audits an existing or planned onboarding email flow, then rewrites it around a single activation event with segmentation, timing, copy, and a measurement plan.

  • Positioning Statement and Messaging Hierarchy for a Product Launch

    Turns product facts, audience insight, and competitor context into a positioning statement, messaging hierarchy, and proof map so a team can approve one launch angle.

  • Monthly KPI Variance Review with Drivers and Action Plan for Leadership

    Converts pasted monthly KPI results and targets into a variance analysis, driver hypotheses, and prioritized actions that a leadership team can decide on in one meeting.

  • Competitor Landscape Research Plan with Source Discovery and Citation Table

    Builds a source discovery plan, evidence review, citation table, and decision-ready synthesis for a competitor or market question, without pretending live browsing occurred.

  • Long-Form Article Brief With Source Discovery Plan and Citation Table

    Creates an editorial brief and outline for a researched article. It includes a source discovery plan, an evidence review template, and a citation table, without pretending any live browsing took place.

  • Customer Interview Synthesis into Themes, Evidence, and Product Decisions

    Turn raw interview notes or transcripts into evidence-backed themes, a quote bank, and a prioritized decision list. It keeps what customers said separate from what you infer.

  • Competitor Research Plan with Source Discovery and Citation Table

    Build a research plan that shows where to find competitor evidence, how to judge sources, and how to log citations. It never claims live browsing happened, so you can verify each source yourself.

  • Codex Characterization-Test-First Refactor with Verification Handoff

    Runs a behavior-preserving refactor in Codex exec. It pins current behavior with characterization tests, refactors in small verified steps inside an allowed scope, and ends with an evidence-based handoff for the merge decision.

  • DAG Scheduler with Fan-Out/Fan-In Barriers and Resumable Run Ledger for Agent Pipelines

    Guides Claude Code to build or refactor a dependency-aware DAG scheduler for agent phases, with cycle validation, bounded parallelism, join policies, retries, and an append-only run ledger so interrupted runs resume without redoing finished nodes.

  • Gemini Google Workspace Source Synthesis Memo with Contradiction Log

    Combines your Docs, Sheets, meeting notes, and outside sources into one decision memo. Separates internal evidence from external research and logs conflicts, gaps, and next actions.

  • Gemini Multimodal Evidence Audit: Screenshots, PDFs, and Charts to Verified Findings

    Has Gemini inspect uploaded images, screenshots, charts, and PDFs, extract what is visible, and verify claims against online sources. Ends in a findings log with confidence ratings and next steps.

  • Pre-PR Self-Review and Pull Request Description from a Git Diff

    Has GitHub Copilot review your branch diff against the base branch, flag defects and missing tests, and draft a PR description with evidence. Use it to decide whether to open the PR or fix issues first.

  • Implement a Scoped Feature in Copilot Agent Mode with Repo Discovery and Tests

    Guides GitHub Copilot agent mode to inspect the repository, state assumptions, plan a minimal change, implement it, and add tests. It ends with a verification report you can use to decide whether to open a PR.

  • 30-Day Social Media Content Calendar Built Around One Offer

    Plans 30 days of posts that lead to one offer: content pillars, a mix of value, proof and ask posts, hooks for each day, and the platform and format to use.

  • Differentiated Lesson Plan for a Mixed-Ability Class

    Writes a timed lesson plan with one shared objective and three tiers of tasks, plus support for learners who need scaffolding and stretch tasks for those who finish early.

  • One-Page Business Plan for a Side Business You Can Test in 30 Days

    Turns a side-business idea into a one-page plan: customer, offer, price, channel, costs, and the cheapest 30-day test that would prove people will pay.

  • Regex Builder With Match and No-Match Test Cases

    Builds a regular expression from a plain-English description and example strings, explains each part, and proves it against strings that should and should not match.

  • Weekly Plan with Time Blocks from a Messy Brain Dump

    Turns an unsorted list of tasks, errands and worries into a realistic week of time blocks, with the hardest work placed in your best hours.

  • Characterization Tests Before a Refactor

    Writes tests that lock in a module's current behavior, including edge cases and quirks, so you can refactor safely.

  • Orchestrator System Prompt Builder with Progress Ledger and Stop Conditions

    Writes a ready-to-deploy orchestrator system prompt that delegates to your workers, tracks progress in a ledger, merges results and stops on defined conditions.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

341 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Claude Code (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.