Prompt library

341 prompts · last added

201 results for “risk-register” · page 4 of 9

  • 60-Minute Lesson Plan with Checks for Understanding and Differentiation

    Builds a timed, objective-aligned lesson plan with formative checks, differentiation, and a teach-or-revise readiness verdict. It asks for missing inputs first and keeps assumptions separate.

  • Discovery Call Plan with Qualification Scorecard

    Builds a tailored discovery call agenda, question bank, and qualification scorecard so a rep can decide whether to advance, nurture, or disqualify an opportunity after the call.

  • Agent Workflow Decomposition with Autonomy Levels and Stop Rules

    Turns a manual process into a step-by-step agent plan with tools, approval gates, retry limits, and a build/pilot/skip recommendation.

  • Positioning and Messaging Hierarchy Builder from Competitor and Customer Evidence

    Turns your product facts, customer evidence, and competitor notes into a tested positioning statement, messaging hierarchy, and proof-gap list so a marketing team can decide what to say and what to validate first.

  • Design System Component Spec Writer for Figma Handoff

    Produces a developer-ready component specification covering anatomy, variants, states, tokens, accessibility, and open questions from a short component brief.

  • Pull Request Review with Merge Recommendation

    Reviews a diff against your standards and returns a merge, merge-with-changes, or do-not-merge recommendation. Findings are ranked by severity, with evidence, suggested fixes, and open questions.

  • Newsletter Issue Builder From Raw Notes and Source Excerpts

    Turns rough notes and supplied source excerpts into a send-ready newsletter issue. It compares lead angles, flags unsupported claims, and ends with a go/no-go checklist before you hit send.

  • Weekly Business Review from a Spreadsheet Using Data Analysis

    Upload a CSV or XLSX and get a metrics review with variance explanations, data-quality flags, and a decision list for the week. Written for ChatGPT's Advanced Data Analysis.

  • Codex CI Failure Triage: Reproduce, Classify, Fix or Hand Off

    Guides Codex through reproducing a failing CI job locally, classifying the cause as code, test, environment, or flaky, applying a minimal fix when safe, and producing an evidence-based handoff for anything it cannot resolve.

  • Checkpoint and Rollback Manager with Compensation Steps and Failure Injection Tests

    Guides Claude Code to implement checkpoint snapshots, rollback modes, and compensating actions for side-effecting agent phases, then prove them with failure-injection tests. Helps you decide the rollback strategy per phase.

  • Typed Phase Handoff Contracts and Validator for Multi-Agent Pipelines

    Has Claude Code define schema-based handoff contracts between agent phases, generate a validator, and add contract tests. Supports the decision of which phase boundaries need strict contracts versus lightweight checks.

  • Gemini Deep Research Brief for a Vendor or Technology Shortlist Decision

    Guides Gemini through source discovery, evidence review, a citation table, and a recommendation for choosing between vendors, tools, or technologies. Keeps evidence, inference, contradictions, and open questions separate.

  • 30-60-90 Day Plan for a New Job With Early Wins and Questions for Your Manager

    Turns a new role and what you know about the team into a 30-60-90 day plan: learning goals, relationships to build, one early win, and questions to agree with your manager in week one.

  • Apology Message That Takes Real Responsibility

    Writes a sincere apology for a mistake at work or in personal life that names what happened, owns the impact, avoids excuses and says what changes next.

  • Cold Email in Three Variants Built Around One Specific Trigger

    Writes three short cold emails for one prospect type, each opening with a different relevant trigger, under 90 words, with a low-effort ask and two follow-ups.

  • End-of-Day Shutdown Review and Tomorrow's Top Three

    A five-minute end-of-day check that records what got done, captures loose ends, and picks three priorities for tomorrow so you can stop thinking about work.

  • Moving House Checklist Planned Backward from Moving Day

    Builds a dated moving checklist counted back from your move date, covering notice periods, utilities, address changes, packing by room and first-night essentials.

  • Plain-English Question to a Correct SQL Query for Your Schema

    Writes a SQL query from a plain-English question using your real table definitions, explains each part, checks it for common mistakes and suggests indexes if it will be slow.

  • Questions Buyers Ask ChatGPT and Perplexity About Your Category, With a Plan to Get Cited

    Lists the questions buyers ask AI assistants about your product category, checks which sources those answers lean on, and plans the pages and facts you need to be cited.

  • Research, Writer and Editor Agent Pipeline With a Handoff Schema

    Designs a three-agent content pipeline where a researcher, writer and editor pass structured handoffs, with the exact fields each agent receives and returns and checks between stages.

  • Shorten and Clarify My Email Without Losing Any Request

    Rewrites a long email to roughly half its length, keeps every fact and ask, puts the request up front, and shows what was cut.

  • Subagent Fan-Out Plan for a Large Codebase Migration

    Plans a big migration so an orchestrating agent can split it into independent chunks for parallel subagents, each with a clear brief, a verification command and merge rules.

  • Codex Exec CI Fixer: Diagnose, Minimal Fix, Rerun, Stop After 3 Attempts

    Gives codex exec a non-interactive procedure to diagnose a failing CI output, apply a minimal fix, rerun the checks and stop after three attempts with a clear report.

  • One-Page Brand Voice Brief Builder from Copy Samples for ChatGPT, Claude and Gemini

    Analyzes your brand copy samples and builds a reusable one-page voice brief with tone rules, banned words, example rewrites and a paste-ready instruction block.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

341 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Claude Code (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.