Prompt library

341 prompts · last added

69 results for “risk-register” · page 3 of 3

  • Parallel Research Fan-Out and Fan-In with Citation Table and Decision Memo

    Splits a research question across parallel research agents, defines source discovery and evidence review steps, merges findings into a citation table, and produces a decision memo without claiming live browsing.

  • Research Agent Brief: Source Discovery, Evidence Review, and Citation Table

    Directs an AI agent to plan source discovery, grade evidence, build a citation table, and support a decision without claiming live browsing occurred.

  • Tool Permission Matrix and Function Spec for a Tool-Using Agent

    Produces a least-privilege tool inventory, function definitions, and approval rules for an agent that calls APIs or internal systems.

  • Cursor Characterization-Test-First Refactor of a Legacy Module

    Has Cursor lock in current behavior with characterization tests before restructuring a legacy module in small steps, so you can decide whether the refactor preserved behavior and is safe to merge.

  • Codex Characterization-Test-First Refactor with Verification Handoff

    Runs a behavior-preserving refactor in Codex exec. It pins current behavior with characterization tests, refactors in small verified steps inside an allowed scope, and ends with an evidence-based handoff for the merge decision.

  • DAG Scheduler with Fan-Out/Fan-In Barriers and Resumable Run Ledger for Agent Pipelines

    Guides Claude Code to build or refactor a dependency-aware DAG scheduler for agent phases, with cycle validation, bounded parallelism, join policies, retries, and an append-only run ledger so interrupted runs resume without redoing finished nodes.

  • Pre-PR Self-Review and Pull Request Description from a Git Diff

    Has GitHub Copilot review your branch diff against the base branch, flag defects and missing tests, and draft a PR description with evidence. Use it to decide whether to open the PR or fix issues first.

  • Implement a Scoped Feature in Copilot Agent Mode with Repo Discovery and Tests

    Guides GitHub Copilot agent mode to inspect the repository, state assumptions, plan a minimal change, implement it, and add tests. It ends with a verification report you can use to decide whether to open a PR.

  • Regex Builder With Match and No-Match Test Cases

    Builds a regular expression from a plain-English description and example strings, explains each part, and proves it against strings that should and should not match.

  • Characterization Tests Before a Refactor

    Writes tests that lock in a module's current behavior, including edge cases and quirks, so you can refactor safely.

  • Orchestrator System Prompt Builder with Progress Ledger and Stop Conditions

    Writes a ready-to-deploy orchestrator system prompt that delegates to your workers, tracks progress in a ledger, merges results and stops on defined conditions.

  • Failing Test First Bug Fix

    Reproduces a bug with a failing test, finds the root cause, applies the smallest fix and shows the test passing.

  • Interview Me Then Plan: Requirements Interview Before Any Code

    Claude Code questions you about a feature's requirements and edge cases, then delivers an implementation plan with acceptance criteria and test commands, without writing code first.

  • Subagent Roster Designer for Your Coding Project

    Produces a 3-5 subagent roster with system prompts, minimal tool permissions, model tiers and explicit handoff rules for your project.

  • Claude Code Plan-Then-Implement a Feature With Approval Checkpoints

    Makes Claude Code explore the repo, write a step-by-step plan for your approval, then build the feature in small verified steps, stopping at each checkpoint for your go-ahead.

  • Cursor Refactor of a Component With Zero Behaviour Change

    Has the Cursor agent restructure a messy component into smaller pieces while proving the behaviour stays identical, using existing tests or new characterization tests first.

  • Meeting Notes to Decisions and Action Items Skill (SKILL.md)

    A SKILL.md that turns any meeting transcript or rough notes into a decision log, owner-and-date action items, open questions and a ready-to-send recap email.

  • Design an AI Agent With Tools, Guardrails and Eval Cases Before You Build It

    Turns an agent idea into a build-ready design: the job, the tools with their inputs and permissions, guardrails, failure handling and a set of evaluation cases to test it.

  • Agent Run Post-Mortem: Trace Root Cause and Prompt or Tool Fixes

    Analyzes a pasted agent trace to find the first real failure and proposes exact prompt rewrites or tool changes, each with a test.

  • Agent Tool Names, Descriptions and JSON Schemas from API Docs

    Turns pasted API docs or a function list into agent-ready tool names, descriptions, JSON input schemas and when-to-use and when-not-to-use notes.

  • Custom Slash Command Builder for Repeated Claude Code Tasks

    Turns a task you repeat into a custom slash command file with frontmatter, arguments, restricted allowed tools and a fixed output format.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

341 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Claude Code (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.