Checkable Guardrail Rules for a Coding Agent: Blocked Commands, Approvals, Secrets and Hooks
Produces a set of testable guardrail rules for your coding agent, covering blocked commands, approval gates, secret handling and hook checks.
341 prompts · last added
69 results for “risk-register” · page 2 of 3
Produces a set of testable guardrail rules for your coding agent, covering blocked commands, approval gates, secret handling and hook checks.
Has Codex inspect your repository and write a short, accurate AGENTS.md with the real build, test and lint commands, conventions and boundaries, checked by actually running them.
A save-ready SKILL.md that has your coding agent review a branch before merge: correctness, security, tests and migrations, with findings ranked by severity and no style nitpicks.
Directs Claude Code to reproduce a reported bug with a failing test, apply the smallest fix, and prove the fix with command output. Use it to decide whether a bug is fixed and safe to merge.
A SKILL.md that makes Claude write and edit in your brand's voice: it reads a VOICE.md in the project, or builds one from samples, then checks every draft against it.
A ready-to-save SKILL.md that makes your coding agent write Conventional Commits messages and pull request descriptions from the staged diff, never from guesses.
A SKILL.md that writes release notes from the commits between two tags, split into a plain-language section for users and a technical changelog for developers.
A SKILL.md that forces your coding agent to reproduce a bug with a failing test before changing code, apply the smallest fix, and prove it with the test suite.
Audits an existing multi-agent pipeline for failure modes and produces retry limits, fallback paths, escalation triggers, and a test plan. Supports the decision on what to harden before wider rollout.
Designs the handoff contracts, stop conditions, and review gates for a sequential chain such as researcher, writer, editor, and fact-checker. Helps you decide whether the chain is ready to run.
Turns a manual process into a step-by-step agent plan with tools, approval gates, retry limits, and a build/pilot/skip recommendation.
Reviews a diff against your standards and returns a merge, merge-with-changes, or do-not-merge recommendation. Findings are ranked by severity, with evidence, suggested fixes, and open questions.
Guides Codex through reproducing a failing CI job locally, classifying the cause as code, test, environment, or flaky, applying a minimal fix when safe, and producing an evidence-based handoff for anything it cannot resolve.
Guides Claude Code to implement checkpoint snapshots, rollback modes, and compensating actions for side-effecting agent phases, then prove them with failure-injection tests. Helps you decide the rollback strategy per phase.
Has Claude Code define schema-based handoff contracts between agent phases, generate a validator, and add contract tests. Supports the decision of which phase boundaries need strict contracts versus lightweight checks.
Writes a SQL query from a plain-English question using your real table definitions, explains each part, checks it for common mistakes and suggests indexes if it will be slow.
Designs a three-agent content pipeline where a researcher, writer and editor pass structured handoffs, with the exact fields each agent receives and returns and checks between stages.
Plans a big migration so an orchestrating agent can split it into independent chunks for parallel subagents, each with a clear brief, a verification command and merge rules.
Gives codex exec a non-interactive procedure to diagnose a failing CI output, apply a minimal fix, rerun the checks and stop after three attempts with a clear report.
Produces a PostToolUse hook entry for settings.json, the script it calls and a concrete procedure to test that the check runs after file edits.
Turns a raw feature or bug request into a paste-ready Codex task with a goal, constraints, files in scope, definition of done and exact verification commands.
Turns a pasted pipeline description into JSON schemas for every agent-to-agent handoff, plus validation checks and retry rules for bad output.
Designs a four-agent pipeline for your report type with each agent's prompt, inputs, outputs and handoff format.
A SKILL.md that has your agent profile a messy CSV or spreadsheet, fix it in a copy with a script, and report every change so the cleaned data can be trusted.
Guide
Nothing that fits? Write a prompt with AI.
341 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.
Most are written for ChatGPT (285), Gemini (260), Claude (217) and Claude Code (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.
Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.
By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.
No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.
Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.