Prompt library

336 prompts · last added

50 results for “critical-path” · page 2 of 3

  • Codex CI Failure Triage: Reproduce, Classify, Fix or Hand Off

    Guides Codex through reproducing a failing CI job locally, classifying the cause as code, test, environment, or flaky, applying a minimal fix when safe, and producing an evidence-based handoff for anything it cannot resolve.

  • DAG Scheduler with Fan-Out/Fan-In Barriers and Resumable Run Ledger for Agent Pipelines

    Guides Claude Code to build or refactor a dependency-aware DAG scheduler for agent phases, with cycle validation, bounded parallelism, join policies, retries, and an append-only run ledger so interrupted runs resume without redoing finished nodes.

  • Typed Phase Handoff Contracts and Validator for Multi-Agent Pipelines

    Has Claude Code define schema-based handoff contracts between agent phases, generate a validator, and add contract tests. Supports the decision of which phase boundaries need strict contracts versus lightweight checks.

  • Rewrite a Vague Issue into a Copilot Coding Agent-Ready Issue

    Turns a vague GitHub issue into a self-contained task with context, testable acceptance criteria, files to touch, and tests to add, so the Copilot coding agent can finish it.

  • Manual Recurring Task to Automation Blueprint for Zapier, Make, or n8n

    Analyzes a recurring manual task and produces an automation blueprint with trigger, steps, data mapping, error handling, and a test plan. It also helps you decide whether the task is worth automating at all.

  • Recurring Workflow to SKILL.md with Trigger, Steps and Verification

    Claude Code interviews you briefly about a repeated workflow and writes a complete SKILL.md with a precise trigger description, steps, supporting files and a verification step.

  • Session Handoff Note for a Fresh Claude Code Session

    Writes a verified handoff file covering changes, decisions, open issues and next steps so a new Claude Code session can continue without re-reading the whole history.

  • Cursor Refactor of a Component With Zero Behaviour Change

    Has the Cursor agent restructure a messy component into smaller pieces while proving the behaviour stays identical, using existing tests or new characterization tests first.

  • Spreadsheet and CSV Cleanup Report Skill (SKILL.md)

    A SKILL.md that has your agent profile a messy CSV or spreadsheet, fix it in a copy with a script, and report every change so the cleaned data can be trusted.

  • Test-First Bug Fix Skill: Reproduce, Fix, Prove (SKILL.md)

    A SKILL.md that forces your coding agent to reproduce a bug with a failing test before changing code, apply the smallest fix, and prove it with the test suite.

  • Fantasy Landscape Phone Wallpaper

    Makes a detailed fantasy landscape sized for a phone lock screen, with the main subject kept low so the clock and notifications stay readable.

  • Unit Test Plan and Test Code for an Existing Function

    Builds a behavior-based test matrix for a function or module and then generates test code in your framework. Covers edge cases, failures, and mocking boundaries, with coverage gaps stated honestly.

  • Codex Pre-Merge Diff Review with Severity-Ranked Findings

    Has Codex review a branch diff against a base ref in read-only mode. It checks correctness, tests, security, and maintainability, and returns evidence-backed findings with severity and a merge recommendation.

  • Executive Decision Memo Builder With Options, Risks, and Recommendation

    Turns a pending business decision into a one-page-style decision memo with scored options, explicit assumptions, risks, missing information, a recommendation, and next actions an executive can approve or reject.

  • Pre-PR Self-Review and Pull Request Description from a Git Diff

    Has GitHub Copilot review your branch diff against the base branch, flag defects and missing tests, and draft a PR description with evidence. Use it to decide whether to open the PR or fix issues first.

  • Standard Operating Procedure From a Screen-Recording Transcript

    Turns the transcript of a recorded walkthrough into a numbered SOP with prerequisites, steps, screenshots to capture, decision points, and common mistakes, ready for a team wiki.

  • Write a SKILL.md From a Workflow You Keep Repeating

    Interviews you about a task you do over and over, then writes a complete, save-ready SKILL.md with a trigger description, steps, output format and stop conditions.

  • Plan Before Edit: Cursor Plan-Mode Prompt for a Feature Request

    Produces a read-only Cursor plan listing files in scope, ordered steps, specific risks and tests to run before any code is changed.

  • 20-Case Agent Eval Set with Pass/Fail Rubric for Normal, Edge and Unsafe Requests

    Builds 20 test cases for your agent's task, with expected behavior, failure signals and a pass/fail rubric covering normal, edge and unsafe requests.

  • Outcome-First Codex Task Writer for a Feature or Bug Request

    Turns a raw feature or bug request into a paste-ready Codex task with a goal, constraints, files in scope, definition of done and exact verification commands.

  • Interview Me Then Plan: Requirements Interview Before Any Code

    Claude Code questions you about a feature's requirements and edge cases, then delivers an implementation plan with acceptance criteria and test commands, without writing code first.

  • Codebase Tour for a Specific Task

    Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.

  • Custom Slash Command Builder for Repeated Claude Code Tasks

    Turns a task you repeat into a custom slash command file with frontmatter, arguments, restricted allowed tools and a fixed output format.

  • Example made with AI: A man in a grey overcoat kneels on a sunlit sidewalk to shake hands with a boy who looks like his younger self, in a red windbreaker and yellow backpack.AI-generated example

    Childhood vs Present Handshake

    Creates a cinematic golden-hour scene of your adult self shaking hands with your younger self using your current and childhood photos.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.