Prompt library

341 prompts · last added

10 results for “risk-register”

  • Topic Cluster Map: Pillar and Supporting Pages Ranked by Build Order

    Build a topic cluster from a keyword list and existing content, then rank which cluster and pages to create first. It includes a keyword-to-page mapping table, internal link rules, and cannibalization risks.

  • Meta Title and Description Variants: 5 Click-Angle Pairs Within Limits

    Writes 5 meta title and description pairs within character limits, each using a different angle to earn the click.

  • Questions Buyers Ask ChatGPT and Perplexity About Your Category, With a Plan to Get Cited

    Lists the questions buyers ask AI assistants about your product category, checks which sources those answers lean on, and plans the pages and facts you need to be cited.

  • Decaying Content Refresh Plan: Outdated Facts, Gaps and a New Intro

    Audits an old article for outdated facts and missing subtopics, proposes new sections and rewrites the intro for your target keyword.

  • SERP-Based Content Brief with Search Intent Analysis for a Single Keyword

    Create a writer-ready content brief from SERP observations you supply. It covers intent, required sections, evidence gaps, and a go or no-go call on whether the page is worth producing.

  • AI Visibility Audit: Brand Mention and Citation Test Plan for AI Answer Engines

    Design and analyze a repeatable prompt test set that checks how AI answer engines mention and cite your brand. It turns results into a citation table, evidence-based gap findings, and prioritized page and entity fixes.

  • Technical SEO Crawl Triage: Prioritized Fix Plan for the Next Sprint

    Turn a crawl export and Search Console data into a scored, sprint-ready technical SEO fix list. It separates facts from assumptions and flags what needs verification before developers start work.

  • GEO Page Audit: Citation Likelihood Score and Rewrites for AI Answers

    Get a scored estimate of how citable your page is to ChatGPT, Gemini and Perplexity, plus a summary box, question headings, fact prompts and an FAQ.

  • Keyword List to Content Plan: Intent Groups, Page Types and Titles

    Turns a raw keyword list into intent-based page groups, each with a recommended page type, title and build order.

  • FAQ Block for Rich Results: 8 Customer Questions and FAQPage JSON-LD

    Extracts 8 genuine customer questions with standalone answers from your page and outputs matching FAQPage JSON-LD.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

341 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Claude Code (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.