Prompt library

336 prompts · last added

17 results for “risk-register”

  • Codex Pre-Merge Diff Review with Severity-Ranked Findings

    Has Codex review a branch diff against a base ref in read-only mode. It checks correctness, tests, security, and maintainability, and returns evidence-backed findings with severity and a merge recommendation.

  • Codex Read-Only Repo Investigation for a Bug Report

    Runs a read-only Codex investigation that maps the relevant code paths, test commands, and likely root causes for a bug report. It ends with a ranked hypothesis table and a go/no-go recommendation before any edits.

  • Codex Pull Request Review With Comments Ranked by Severity

    Has Codex review a pull request and return comments sorted into blocking, should-fix and nit, each with the file and line, the risk, and a suggested change.

  • Codex Writes an AGENTS.md for This Repository From the Real Setup

    Has Codex inspect your repository and write a short, accurate AGENTS.md with the real build, test and lint commands, conventions and boundaries, checked by actually running them.

  • Pre-Merge Code Review Checklist Skill (SKILL.md)

    A save-ready SKILL.md that has your coding agent review a branch before merge: correctness, security, tests and migrations, with findings ranked by severity and no style nitpicks.

  • Brand Voice Guard Skill That Checks Drafts Against VOICE.md (SKILL.md)

    A SKILL.md that makes Claude write and edit in your brand's voice: it reads a VOICE.md in the project, or builds one from samples, then checks every draft against it.

  • Conventional Commit and PR Description Writer Skill (SKILL.md)

    A ready-to-save SKILL.md that makes your coding agent write Conventional Commits messages and pull request descriptions from the staged diff, never from guesses.

  • Release Notes From Git Log Skill for Users and Developers (SKILL.md)

    A SKILL.md that writes release notes from the commits between two tags, split into a plain-language section for users and a technical changelog for developers.

  • Test-First Bug Fix Skill: Reproduce, Fix, Prove (SKILL.md)

    A SKILL.md that forces your coding agent to reproduce a bug with a failing test before changing code, apply the smallest fix, and prove it with the test suite.

  • Codex CI Failure Triage: Reproduce, Classify, Fix or Hand Off

    Guides Codex through reproducing a failing CI job locally, classifying the cause as code, test, environment, or flaky, applying a minimal fix when safe, and producing an evidence-based handoff for anything it cannot resolve.

  • Research, Writer and Editor Agent Pipeline With a Handoff Schema

    Designs a three-agent content pipeline where a researcher, writer and editor pass structured handoffs, with the exact fields each agent receives and returns and checks between stages.

  • Subagent Fan-Out Plan for a Large Codebase Migration

    Plans a big migration so an orchestrating agent can split it into independent chunks for parallel subagents, each with a clear brief, a verification command and merge rules.

  • Codex Exec CI Fixer: Diagnose, Minimal Fix, Rerun, Stop After 3 Attempts

    Gives codex exec a non-interactive procedure to diagnose a failing CI output, apply a minimal fix, rerun the checks and stop after three attempts with a clear report.

  • Outcome-First Codex Task Writer for a Feature or Bug Request

    Turns a raw feature or bug request into a paste-ready Codex task with a goal, constraints, files in scope, definition of done and exact verification commands.

  • Spreadsheet and CSV Cleanup Report Skill (SKILL.md)

    A SKILL.md that has your agent profile a messy CSV or spreadsheet, fix it in a copy with a script, and report every change so the cleaned data can be trusted.

  • Codex Characterization-Test-First Refactor with Verification Handoff

    Runs a behavior-preserving refactor in Codex exec. It pins current behavior with characterization tests, refactors in small verified steps inside an allowed scope, and ends with an evidence-based handoff for the merge decision.

  • Meeting Notes to Decisions and Action Items Skill (SKILL.md)

    A SKILL.md that turns any meeting transcript or rough notes into a decision log, owner-and-date action items, open questions and a ready-to-send recap email.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.