Prompt library

336 prompts · last added

32 results for “risk-register” · page 1 of 2

  • Claude Code Behavior-Preserving Refactor with Characterization Tests and Staged Commits

    Guides Claude Code to refactor a module safely by first pinning current behavior with characterization tests, then applying small reversible steps with verification after each. Delivers a diff, risk register, and rollback plan.

  • Recurring Workflow to SKILL.md with Trigger, Steps and Verification

    Claude Code interviews you briefly about a repeated workflow and writes a complete SKILL.md with a precise trigger description, steps, supporting files and a verification step.

  • Dependency Graph Planner for a Multi-Agent Software Release Workflow

    Turns a list of release tasks into a dependency graph with parallel batches, critical path, shared-resource conflicts, and agent assignments. Supports the decision on what to run now versus wait on.

  • Write a SKILL.md From a Workflow You Keep Repeating

    Interviews you about a task you do over and over, then writes a complete, save-ready SKILL.md with a trigger description, steps, output format and stop conditions.

  • Coding Agent Task Brief with Guardrails, Test Plan, and Rollback Steps

    Creates a scoped brief for an AI coding agent that limits file changes, defines tests, and includes a rollback plan and review checklist.

  • Parallel Git Worktree Task Split with Interface Contracts and Merge Order

    Turns a pasted feature spec into independent coding-agent tasks with file ownership, interface contracts, a merge order and a done command for each task.

  • Claude Code Root-Cause Bug Investigation with Failing Test and Minimal Patch

    Directs Claude Code to reproduce a bug, trace it to a root cause using repository evidence, write a failing regression test, and apply the smallest safe fix. Ends with a verified diff, risks, and next actions.

  • Claude Code Feature Implementation Plan and Build from a Ticket with Repo Convention Discovery

    Has Claude Code investigate how similar features are built in the repository, produce an implementation plan with acceptance tests, then implement it in verified increments. Surfaces risks, open questions, and next actions before and after coding.

  • CLAUDE.md or AGENTS.md Audit: Cut, Rewrite as Checkable Rules, Move to Skills

    Turns a pasted CLAUDE.md or AGENTS.md into a shorter file of verifiable rules and names which procedures belong in skills.

  • Codebase Tour for a Specific Task

    Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.

  • Codex Writes an AGENTS.md for This Repository From the Real Setup

    Has Codex inspect your repository and write a short, accurate AGENTS.md with the real build, test and lint commands, conventions and boundaries, checked by actually running them.

  • Pre-Merge Code Review Checklist Skill (SKILL.md)

    A save-ready SKILL.md that has your coding agent review a branch before merge: correctness, security, tests and migrations, with findings ranked by severity and no style nitpicks.

  • Brand Voice Guard Skill That Checks Drafts Against VOICE.md (SKILL.md)

    A SKILL.md that makes Claude write and edit in your brand's voice: it reads a VOICE.md in the project, or builds one from samples, then checks every draft against it.

  • Conventional Commit and PR Description Writer Skill (SKILL.md)

    A ready-to-save SKILL.md that makes your coding agent write Conventional Commits messages and pull request descriptions from the staged diff, never from guesses.

  • Release Notes From Git Log Skill for Users and Developers (SKILL.md)

    A SKILL.md that writes release notes from the commits between two tags, split into a plain-language section for users and a technical changelog for developers.

  • Test-First Bug Fix Skill: Reproduce, Fix, Prove (SKILL.md)

    A SKILL.md that forces your coding agent to reproduce a bug with a failing test before changing code, apply the smallest fix, and prove it with the test suite.

  • Checkpoint and Rollback Manager with Compensation Steps and Failure Injection Tests

    Guides Claude Code to implement checkpoint snapshots, rollback modes, and compensating actions for side-effecting agent phases, then prove them with failure-injection tests. Helps you decide the rollback strategy per phase.

  • Typed Phase Handoff Contracts and Validator for Multi-Agent Pipelines

    Has Claude Code define schema-based handoff contracts between agent phases, generate a validator, and add contract tests. Supports the decision of which phase boundaries need strict contracts versus lightweight checks.

  • Research, Writer and Editor Agent Pipeline With a Handoff Schema

    Designs a three-agent content pipeline where a researcher, writer and editor pass structured handoffs, with the exact fields each agent receives and returns and checks between stages.

  • Subagent Fan-Out Plan for a Large Codebase Migration

    Plans a big migration so an orchestrating agent can split it into independent chunks for parallel subagents, each with a clear brief, a verification command and merge rules.

  • Claude Code Hook Writer: Auto-Run Lint, Typecheck or Tests After Edits

    Produces a PostToolUse hook entry for settings.json, the script it calls and a concrete procedure to test that the check runs after file edits.

  • Spreadsheet and CSV Cleanup Report Skill (SKILL.md)

    A SKILL.md that has your agent profile a messy CSV or spreadsheet, fix it in a copy with a script, and report every change so the cleaned data can be trusted.

  • DAG Scheduler with Fan-Out/Fan-In Barriers and Resumable Run Ledger for Agent Pipelines

    Guides Claude Code to build or refactor a dependency-aware DAG scheduler for agent phases, with cycle validation, bounded parallelism, join policies, retries, and an append-only run ledger so interrupted runs resume without redoing finished nodes.

  • Characterization Tests Before a Refactor

    Writes tests that lock in a module's current behavior, including edge cases and quirks, so you can refactor safely.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.