Prompt library

336 prompts · last added

30 results for “risk-register” · page 1 of 2

  • Write a SKILL.md From a Workflow You Keep Repeating

    Interviews you about a task you do over and over, then writes a complete, save-ready SKILL.md with a trigger description, steps, output format and stop conditions.

  • Unit Test Plan and Test Code for an Existing Function

    Builds a behavior-based test matrix for a function or module and then generates test code in your framework. Covers edge cases, failures, and mocking boundaries, with coverage gaps stated honestly.

  • Conventional Commit and PR Description from a Diff and Ticket

    Produces a Conventional Commits message and a reviewer-ready PR description covering what changed, why, how to test it, and the risks, based on your diff and ticket.

  • Rewrite a Vague Issue into a Copilot Coding Agent-Ready Issue

    Turns a vague GitHub issue into a self-contained task with context, testable acceptance criteria, files to touch, and tests to add, so the Copilot coding agent can finish it.

  • Codebase Tour for a Specific Task

    Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.

  • Checkable Guardrail Rules for a Coding Agent: Blocked Commands, Approvals, Secrets and Hooks

    Produces a set of testable guardrail rules for your coding agent, covering blocked commands, approval gates, secret handling and hook checks.

  • Pre-Merge Code Review Checklist Skill (SKILL.md)

    A save-ready SKILL.md that has your coding agent review a branch before merge: correctness, security, tests and migrations, with findings ranked by severity and no style nitpicks.

  • Brand Voice Guard Skill That Checks Drafts Against VOICE.md (SKILL.md)

    A SKILL.md that makes Claude write and edit in your brand's voice: it reads a VOICE.md in the project, or builds one from samples, then checks every draft against it.

  • Conventional Commit and PR Description Writer Skill (SKILL.md)

    A ready-to-save SKILL.md that makes your coding agent write Conventional Commits messages and pull request descriptions from the staged diff, never from guesses.

  • Release Notes From Git Log Skill for Users and Developers (SKILL.md)

    A SKILL.md that writes release notes from the commits between two tags, split into a plain-language section for users and a technical changelog for developers.

  • Test-First Bug Fix Skill: Reproduce, Fix, Prove (SKILL.md)

    A SKILL.md that forces your coding agent to reproduce a bug with a failing test before changing code, apply the smallest fix, and prove it with the test suite.

  • Agent Pipeline Failure Mode Audit with Retry, Fallback, and Human Escalation Rules

    Audits an existing multi-agent pipeline for failure modes and produces retry limits, fallback paths, escalation triggers, and a test plan. Supports the decision on what to harden before wider rollout.

  • Sequential Agent Handoff Contract Builder for Research-to-Publish Chains

    Designs the handoff contracts, stop conditions, and review gates for a sequential chain such as researcher, writer, editor, and fact-checker. Helps you decide whether the chain is ready to run.

  • Agent Workflow Decomposition with Autonomy Levels and Stop Rules

    Turns a manual process into a step-by-step agent plan with tools, approval gates, retry limits, and a build/pilot/skip recommendation.

  • Pull Request Review with Merge Recommendation

    Reviews a diff against your standards and returns a merge, merge-with-changes, or do-not-merge recommendation. Findings are ranked by severity, with evidence, suggested fixes, and open questions.

  • Plain-English Question to a Correct SQL Query for Your Schema

    Writes a SQL query from a plain-English question using your real table definitions, explains each part, checks it for common mistakes and suggests indexes if it will be slow.

  • Research, Writer and Editor Agent Pipeline With a Handoff Schema

    Designs a three-agent content pipeline where a researcher, writer and editor pass structured handoffs, with the exact fields each agent receives and returns and checks between stages.

  • Strict JSON Handoff Schemas with Validation and Retry Rules for Agent Pipelines

    Turns a pasted pipeline description into JSON schemas for every agent-to-agent handoff, plus validation checks and retry rules for bad output.

  • Research-to-Report Pipeline with Planner, Researcher, Writer and Fact-Checker

    Designs a four-agent pipeline for your report type with each agent's prompt, inputs, outputs and handoff format.

  • Spreadsheet and CSV Cleanup Report Skill (SKILL.md)

    A SKILL.md that has your agent profile a messy CSV or spreadsheet, fix it in a copy with a script, and report every change so the cleaned data can be trusted.

  • Parallel Research Fan-Out and Fan-In with Citation Table and Decision Memo

    Splits a research question across parallel research agents, defines source discovery and evidence review steps, merges findings into a citation table, and produces a decision memo without claiming live browsing.

  • Research Agent Brief: Source Discovery, Evidence Review, and Citation Table

    Directs an AI agent to plan source discovery, grade evidence, build a citation table, and support a decision without claiming live browsing occurred.

  • Tool Permission Matrix and Function Spec for a Tool-Using Agent

    Produces a least-privilege tool inventory, function definitions, and approval rules for an agent that calls APIs or internal systems.

  • Regex Builder With Match and No-Match Test Cases

    Builds a regular expression from a plain-English description and example strings, explains each part, and proves it against strings that should and should not match.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.