Prompt library

336 prompts · last added

7 results for “risk-register”

  • Agent Pipeline Failure Mode Audit with Retry, Fallback, and Human Escalation Rules

    Audits an existing multi-agent pipeline for failure modes and produces retry limits, fallback paths, escalation triggers, and a test plan. Supports the decision on what to harden before wider rollout.

  • Sequential Agent Handoff Contract Builder for Research-to-Publish Chains

    Designs the handoff contracts, stop conditions, and review gates for a sequential chain such as researcher, writer, editor, and fact-checker. Helps you decide whether the chain is ready to run.

  • Research, Writer and Editor Agent Pipeline With a Handoff Schema

    Designs a three-agent content pipeline where a researcher, writer and editor pass structured handoffs, with the exact fields each agent receives and returns and checks between stages.

  • Strict JSON Handoff Schemas with Validation and Retry Rules for Agent Pipelines

    Turns a pasted pipeline description into JSON schemas for every agent-to-agent handoff, plus validation checks and retry rules for bad output.

  • Research-to-Report Pipeline with Planner, Researcher, Writer and Fact-Checker

    Designs a four-agent pipeline for your report type with each agent's prompt, inputs, outputs and handoff format.

  • Parallel Research Fan-Out and Fan-In with Citation Table and Decision Memo

    Splits a research question across parallel research agents, defines source discovery and evidence review steps, merges findings into a citation table, and produces a decision memo without claiming live browsing.

  • Subagent Roster Designer for Your Coding Project

    Produces a 3-5 subagent roster with system prompts, minimal tool permissions, model tiers and explicit handoff rules for your project.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.