Prompt library

341 prompts · last added

5 results for “risk-register”

  • 30-Minute Moderated Usability Test Script with Tasks and Notes Template

    Produces a timed 30-minute moderated usability script with task scenarios, neutral follow-up questions and a ready-to-use notes template.

  • Design System Component Spec Writer for Figma Handoff

    Produces a developer-ready component specification covering anatomy, variants, states, tokens, accessibility, and open questions from a short component brief.

  • Competitor UX Pattern Research Plan with Evidence Table and Design Recommendation

    Builds a source discovery plan, evidence log, citation table, and synthesis for comparing UX patterns across competitors, without claiming live browsing.

  • Design Brief from Client Notes with Assumptions and Next Actions

    Turns a client's rough notes into a structured design brief with goals, audience, deliverables, constraints, references to gather and measurable success criteria.

  • UX Flow Audit from Screenshots with Prioritized Fix Plan

    Audits a user flow from screenshots or descriptions and returns an evidence-labeled issue table plus a fix-now, next, defer plan for a sprint decision.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

341 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Claude Code (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.