Prompt library

336 prompts · last added

8 results for “risk-register”

  • Unit Test Plan and Test Code for an Existing Function

    Builds a behavior-based test matrix for a function or module and then generates test code in your framework. Covers edge cases, failures, and mocking boundaries, with coverage gaps stated honestly.

  • Architecture Decision Record for a Technology Choice

    Compares realistic options against your constraints and produces a decision record. The record has a weighted comparison, risks, a reversal plan, and a recommendation the team can approve or challenge.

  • Codebase Tour for a Specific Task

    Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.

  • Pull Request Review with Merge Recommendation

    Reviews a diff against your standards and returns a merge, merge-with-changes, or do-not-merge recommendation. Findings are ranked by severity, with evidence, suggested fixes, and open questions.

  • Plain-English Question to a Correct SQL Query for Your Schema

    Writes a SQL query from a plain-English question using your real table definitions, explains each part, checks it for common mistakes and suggests indexes if it will be slow.

  • Regex Builder With Match and No-Match Test Cases

    Builds a regular expression from a plain-English description and example strings, explains each part, and proves it against strings that should and should not match.

  • Characterization Tests Before a Refactor

    Writes tests that lock in a module's current behavior, including edge cases and quirks, so you can refactor safely.

  • Failing Test First Bug Fix

    Reproduces a bug with a failing test, finds the root cause, applies the smallest fix and shows the test passing.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.