Write a SKILL.md From a Workflow You Keep Repeating
Interviews you about a task you do over and over, then writes a complete, save-ready SKILL.md with a trigger description, steps, output format and stop conditions.
336 prompts · last added
36 results for “risk-register” · page 1 of 2
Interviews you about a task you do over and over, then writes a complete, save-ready SKILL.md with a trigger description, steps, output format and stop conditions.
Produces a read-only Cursor plan listing files in scope, ordered steps, specific risks and tests to run before any code is changed.
Builds a behavior-based test matrix for a function or module and then generates test code in your framework. Covers edge cases, failures, and mocking boundaries, with coverage gaps stated honestly.
Runs a read-only Codex investigation that maps the relevant code paths, test commands, and likely root causes for a bug report. It ends with a ranked hypothesis table and a go/no-go recommendation before any edits.
Has Codex review a pull request and return comments sorted into blocking, should-fix and nit, each with the file and line, the risk, and a suggested change.
Guides Cursor Agent through reproducing a bug, isolating the root cause with evidence, applying a minimal diff, and adding a regression test, ending with a verification checklist and risks.
Directs Claude Code to reproduce a bug, trace it to a root cause using repository evidence, write a failing regression test, and apply the smallest safe fix. Ends with a verified diff, risks, and next actions.
Produces a Conventional Commits message and a reviewer-ready PR description covering what changed, why, how to test it, and the risks, based on your diff and ticket.
Turns a vague GitHub issue into a self-contained task with context, testable acceptance criteria, files to touch, and tests to add, so the Copilot coding agent can finish it.
Turns a pasted CLAUDE.md or AGENTS.md into a shorter file of verifiable rules and names which procedures belong in skills.
Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.
Has Codex inspect your repository and write a short, accurate AGENTS.md with the real build, test and lint commands, conventions and boundaries, checked by actually running them.
A SKILL.md that makes Claude write and edit in your brand's voice: it reads a VOICE.md in the project, or builds one from samples, then checks every draft against it.
A ready-to-save SKILL.md that makes your coding agent write Conventional Commits messages and pull request descriptions from the staged diff, never from guesses.
A SKILL.md that writes release notes from the commits between two tags, split into a plain-language section for users and a technical changelog for developers.
A SKILL.md that forces your coding agent to reproduce a bug with a failing test before changing code, apply the smallest fix, and prove it with the test suite.
Designs the handoff contracts, stop conditions, and review gates for a sequential chain such as researcher, writer, editor, and fact-checker. Helps you decide whether the chain is ready to run.
Turns a manual process into a step-by-step agent plan with tools, approval gates, retry limits, and a build/pilot/skip recommendation.
Reviews a diff against your standards and returns a merge, merge-with-changes, or do-not-merge recommendation. Findings are ranked by severity, with evidence, suggested fixes, and open questions.
Has Claude Code define schema-based handoff contracts between agent phases, generate a validator, and add contract tests. Supports the decision of which phase boundaries need strict contracts versus lightweight checks.
Writes a SQL query from a plain-English question using your real table definitions, explains each part, checks it for common mistakes and suggests indexes if it will be slow.
Turns a raw feature or bug request into a paste-ready Codex task with a goal, constraints, files in scope, definition of done and exact verification commands.
Designs a four-agent pipeline for your report type with each agent's prompt, inputs, outputs and handoff format.
A SKILL.md that has your agent profile a messy CSV or spreadsheet, fix it in a copy with a script, and report every change so the cleaned data can be trusted.
Guide
Nothing that fits? Write a prompt with AI.
336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.
Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.
Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.
By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.
No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.
Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.