Prompt library

336 prompts · last added

10 results for “critical-path”

  • Cursor Project Rules Generator for Your Repo's Stack

    Has Cursor inspect your repository and write 3-5 scoped .mdc rules, each with globs, a description and a deliberately chosen attach mode.

  • Cursor .mdc Rules to Portable AGENTS.md Converter

    Converts your pasted Cursor .mdc rules into a single AGENTS.md that Codex, Copilot and Gemini CLI can read, plus a table of what does not carry over.

  • Edge-Case Test Suite for One Function in Your Existing Test Framework

    Writes tests for a single function that cover normal inputs, boundaries, bad input and error paths, in the test framework your project already uses.

  • Explain a Codebase Folder to a New Developer on Their First Day

    Produces an onboarding guide for one folder of a codebase: what it does, how data moves through it, the files to read first and the traps a new developer should avoid.

  • Cursor Agent Bug Triage: Reproduce, Root-Cause, Fix, and Regression Test

    Guides Cursor Agent through reproducing a bug, isolating the root cause with evidence, applying a minimal diff, and adding a regression test, ending with a verification checklist and risks.

  • Cursor Refactor of a Component With Zero Behaviour Change

    Has the Cursor agent restructure a messy component into smaller pieces while proving the behaviour stays identical, using existing tests or new characterization tests first.

  • Test-First Bug Fix Skill: Reproduce, Fix, Prove (SKILL.md)

    A SKILL.md that forces your coding agent to reproduce a bug with a failing test before changing code, apply the smallest fix, and prove it with the test suite.

  • Unit Test Plan and Test Code for an Existing Function

    Builds a behavior-based test matrix for a function or module and then generates test code in your framework. Covers edge cases, failures, and mocking boundaries, with coverage gaps stated honestly.

  • Plan Before Edit: Cursor Plan-Mode Prompt for a Feature Request

    Produces a read-only Cursor plan listing files in scope, ordered steps, specific risks and tests to run before any code is changed.

  • Codebase Tour for a Specific Task

    Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.