Prompt library

336 prompts · last added

16 results for “risk-register”

  • Write a SKILL.md From a Workflow You Keep Repeating

    Interviews you about a task you do over and over, then writes a complete, save-ready SKILL.md with a trigger description, steps, output format and stop conditions.

  • Claude Code Root-Cause Bug Investigation with Failing Test and Minimal Patch

    Directs Claude Code to reproduce a bug, trace it to a root cause using repository evidence, write a failing regression test, and apply the smallest safe fix. Ends with a verified diff, risks, and next actions.

  • CLAUDE.md or AGENTS.md Audit: Cut, Rewrite as Checkable Rules, Move to Skills

    Turns a pasted CLAUDE.md or AGENTS.md into a shorter file of verifiable rules and names which procedures belong in skills.

  • Codebase Tour for a Specific Task

    Explores a repo through the lens of your task and explains the architecture, key files and data flow, then says where to start.

  • Codex Writes an AGENTS.md for This Repository From the Real Setup

    Has Codex inspect your repository and write a short, accurate AGENTS.md with the real build, test and lint commands, conventions and boundaries, checked by actually running them.

  • Brand Voice Guard Skill That Checks Drafts Against VOICE.md (SKILL.md)

    A SKILL.md that makes Claude write and edit in your brand's voice: it reads a VOICE.md in the project, or builds one from samples, then checks every draft against it.

  • Conventional Commit and PR Description Writer Skill (SKILL.md)

    A ready-to-save SKILL.md that makes your coding agent write Conventional Commits messages and pull request descriptions from the staged diff, never from guesses.

  • Release Notes From Git Log Skill for Users and Developers (SKILL.md)

    A SKILL.md that writes release notes from the commits between two tags, split into a plain-language section for users and a technical changelog for developers.

  • Test-First Bug Fix Skill: Reproduce, Fix, Prove (SKILL.md)

    A SKILL.md that forces your coding agent to reproduce a bug with a failing test before changing code, apply the smallest fix, and prove it with the test suite.

  • Typed Phase Handoff Contracts and Validator for Multi-Agent Pipelines

    Has Claude Code define schema-based handoff contracts between agent phases, generate a validator, and add contract tests. Supports the decision of which phase boundaries need strict contracts versus lightweight checks.

  • Spreadsheet and CSV Cleanup Report Skill (SKILL.md)

    A SKILL.md that has your agent profile a messy CSV or spreadsheet, fix it in a copy with a script, and report every change so the cleaned data can be trusted.

  • Failing Test First Bug Fix

    Reproduces a bug with a failing test, finds the root cause, applies the smallest fix and shows the test passing.

  • Interview Me Then Plan: Requirements Interview Before Any Code

    Claude Code questions you about a feature's requirements and edge cases, then delivers an implementation plan with acceptance criteria and test commands, without writing code first.

  • Claude Code Plan-Then-Implement a Feature With Approval Checkpoints

    Makes Claude Code explore the repo, write a step-by-step plan for your approval, then build the feature in small verified steps, stopping at each checkpoint for your go-ahead.

  • Meeting Notes to Decisions and Action Items Skill (SKILL.md)

    A SKILL.md that turns any meeting transcript or rough notes into a decision log, owner-and-date action items, open questions and a ready-to-send recap email.

  • Custom Slash Command Builder for Repeated Claude Code Tasks

    Turns a task you repeat into a custom slash command file with frontmatter, arguments, restricted allowed tools and a fixed output format.

Guide

Using the library

  1. Narrow the list by type, tool or topic, or search for the task you have.
  2. Copy a prompt from its card, or open it to read it in full and fill in the blanks first.
  3. Paste it into your AI tool and check the answer against the format the prompt asks for.

Nothing that fits? Write a prompt with AI.

What is in the prompt library?

336 copy-ready prompts for productivity, writing, business and coding and more. Each one sets the role, the steps and the output format, and marks the parts you fill in with curly brackets.

Which AI tools are the prompts written for?

Most are written for ChatGPT (285), Gemini (260), Claude (217) and Midjourney (42); the number is how many prompts list that tool. Each prompt page lists its tools, and most text prompts also work in any capable chat model.

What are the highlighted blanks?

Words in curly brackets, such as {audience}, are the parts you replace with your own details. Choose “Ready to use (no blanks)” in the filters to see prompts you can paste as they are.

How are the prompts sorted?

By how often they are copied, unless you choose another order. Newest shows the latest additions first. Trending ranks prompts by copies, opens and saves over the last two weeks.

Do I need an account?

No. Every prompt is free to copy or open in your AI tool. A free account lets you save prompts to your vault.

Can I write my own prompt?

Yes. Write with AI asks what you need, builds a short form for it, and writes the prompt as you fill it in.